Loading...
Park West CC(02-2)-LR050901GEOTECHNICAL AND r~ J~ r-1 U ~ ENVIRONHENTAL CONSULTANTS INJECTION CONF~LTS POST Park West~erce Center f / Beltline-R~ad and Airline Road ..~1/~, J Coppell, Texas 1 J'~' ~ REPORTED TO: Cadence McShane Corporation REPORT NO. 27 14860 Montfort Drive, Suite 270 REPORT DATE: 09-01-05 Dallas, Texas 75254 REG PROJECT NO. 12468 ATTN: Mr. Bobby Paret PAGE: 1 of 1 CONTRACTOR: Cadence McShane Corporation ~ AREA REPRESENTED: Building B, 0-200'S, 0-75'W from N.E. buildin/~orner. Boring Number/Pocket Pen Date Depth 1~?05 Sampled (feet) W-17 -18 W-19 08-16-05 0.0 - 1.5 1.0 0.5 1.5 - 3.0 1.25 / 0.5 3.0 - 4.5 0.75/ 1.5 1.2 4.5 - 6.0 4.5+ 1.25 1.75 6.0 - 7.5 4.5 1.5 1.5 7.5 - 9.0 2.5 1.75 2.5 9.0 - 10.0 2.25 1.0 2.25 FREE SWELL TEST RESULTS: Borinq Depth % Swell Final Penetrometer Readinq W-17 4.5 - 6.0 6.0 2.25 Comments: Borings obtained after three injection passes. Based on the test results, an additional pass is considered necessary for an area located at 0-100'S, 0-50'W from N.E. Mail building corner. Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret REED ENGINEERING GROUP, LTD. (1) Commerce Construction Co., LP/ Mr. Rick Wyly Original Signed By (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Keith E. Atkins (1) Northwestern Investment Mgmt./ Manager, C.M.T. Mr. Ernest Willmore KENrs (1) Stewart Consulting Associates/ Mr. Mike Smith 2424STUTZ DR. * SUITE400 ,, DALLAS. TX 75235 · TELl214]3505600" F^X[214] 3500019 I~IEE~I-11 Er--lr~ I r-lEEl~llr-lr-4 GEOTECHNiCALAND r~ F~ r-~ i i p £NVlI~ON~IENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Park West Commerce Center Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret REPORT NO. 22 REPORT DATE: 09-01-05 REG PROJECT NO. 12468 PAGE: 1 of 1 Date Sampled W-10 W-11 08-15-05 0.0 - 1.5 0.5 0.75 1.25 1.0 1.5 - 3.0 1.25 1.0 1.5 0.75 3.0 - 4.5 1.75 1.25 1.25 1.5 4.5 - 6.0 2.5 1.5 1.75 2.0 6.0 - 7.5 2.0 2.5 4.25 2.75 7.5 - 9.0 2.25 2.25 1.5 2.0 9.0 - 10.0 2.5 2.0 2.5 2.25 CONTRACTOR: Cadence McShane Corporation AREA REPRESENTED: Building A south half. Boring Number/Pocket Pen Depth W-9 (feet) W-8 Boring Number/Pocket Pen Depth W-13 (feet) W-12 W-14 W-15 W-16 0.0 - 1.5 1.0 0.5 0.75 0.75 0.5 1.5 - 3.0 1.75 1.25 1.25 1.25 1.25 3.0 - 4.5 1.5 1.75 1.5 1.5 1.5 4.5 - 6.0 1.75 1.5 1.75 1.5 1.75 6.0 - 7.5 1.75 1.5 2.0 ! .75 1.75 7.5 - 9.0 1.75 2.0 1.75 1.75 2.0 9.0 - 10.0 1.5 1.5 1.75 2.0 2.5 Comments: Borings obtained after three injection passes. Based on the test results, an additional pass is not considered necessary. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Parer (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. BW/rs 2424STUTZ DR. ,, SUITE 400 · DALLAS, TX 75235 ',' TEL [2]4] 350 5600 * FAX [214] 3500019 POST INJECTION CONFIRMATION RESULTS Park West Commerce Center Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret REPORT NO. 31 REPORT DATE: 09-01-05 REG PROJECT NO. 12468 PAGE: 1 of 2 CONTRACTOR: Cadence McShane Corporation AREA REPRESENTED: Building B, 0-600'S, 0-130'E from the N.W. building corner. Boring Number/Pocket Pen Date Depth W-21 Sampled (feet) W-20 W-22 W-23 08-22-05 0.0 - 1.5 1.0 1.0 1.75 0.5 1.5 - 3.0 0.75 1.0 1.75 1.0 3.0 - 4.5 1.75 1.25 1.75 1.25 4.5 - 6.0 4.5++ 1.25 2.25 4.5 6.0 - 7.5 4.5++ 2.25 4.5+ 4.5+ 7.5 - 9.0 4.5+ 2.0 4.5+ 2.5 9.0 - 10.0 4.5+ 2.25 3.5 2.0 Boring NumbedPocket Pen Depth W-25 (feet) W-24 W-26 W-27 W-28 0.0 - 1.5 0.75 0.75 1.0 2.25 0.75 1.5 - 3.0 1.0 1.25 0.75 1.75 1.0 3.0-4.5 1.25 4.5 1.0 2.0 2.25 4.5 - 6.0 1.5 4.5 1.25 1.25 4.5+ 6.0 - 7.5 2.75 2.5 2.75 1.25 2.25 7.5 - 9.0 1.25 2.75 3.0 1.5 2.0 9.0 - 10.0 2.25 2.25 2.75 2.25 2.75 FREE SWELL TEST RESULTS: Boring Depth % Swell Final Penetrometer Readinq W-20 4.5-6.0 2.7 2.5 W-20 7.5-9.0 3.8 2.75 W-23 6.0-7.5 2.0 2.75 W-25 3.0-4.5 4.0 2.0 2424 STUTZ DR." SUITE 400 ', DALLAS, TX 75235" 1EL [214] 3505600 * FAX [214] 3500019 REPORT NO. 31 REPORT DATE: 09-01-05 REG PROJECT NO. 12468 PAGE: 2 of 2 Comments: Borings obtained after three injection passes. Based on the test results, an additional pass is not considered necessary for an area located at 0-150'S, 0-50'E from the N.W. building corner and 400-500's, 0-50'W and 0-100'S, 0-50'W from the N.E. building corner. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. KEA/rs POST INJECTION CONFIRMATION RESULTS Park West Commerce Center Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret REPORT NO. 32 REPORT DATE: 09-01-05 REG PROJECT NO. 12468 PAGE: 1 of 1 CONTRACTOR: Cadence McShane Corporation AREA REPRESENTED: Building B, 0-200'N, 0-160'W from S.E. building corner and 0-100'S, 0-50'W from the N.E. building corner. Boring Number/Pocket Pen Date Depth W-30 Sampled (feet) W-29 W-31 W-32 W-33 0.0 - 1.5 0.75 1,5 2.5 2.0 1.25 1.5 - 3.0 2.25 2.5 2.5 2.0 1.0 3.0 - 4.5 2.25 2.25 3.0 2.25 1.5 4.5 - 6.0 3.75 2.75 4.0 2.5 2.75 6.0 - 7.5 4.0 2.75 3.0 2.5 3.25 7.5 - 9.0 2,5 2.5 3,5 3,25 3.75 9.0 - 10.0 2.25 2.5 3.5 2.75 2.5 Comments: Borings W-29 through W-32 obtained after three injection passes and Borings W-33 after four passes. Based on the test results, an additional pass is not considered necessary. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. BW/rs 2424STUTZ DR. * SUITE 400 · DALLAS, TX 75235 * TEL [214] 3505600 '* F^X [214] 3500019