Loading...
Rozas Addn-LR050830Concrete Compression Test Report C M{ ENC;INEER~NC,.- ~NC~~ '~'' '~' ~ - 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (8'{ 7) 284-9400 Fax: (817) 589-9993 Client: Tri-Star Construction Repont Distribution: ('{) Tri-Star Construction Project: Dr. Roza's Office (1) City of Coppell Coppell CMJ Report No.: 548-5051-021 Report Date: 08/30/2005 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 07/28/2005 Slump 3 in min 5 in max Sampled By Richard Jones Air Content 3 % rain 6 % max Weather Cloudy/Slight Breeze Concrete Temperature n/a SuppliedMix TXI/517 Ambient Temperature n/a Air Content Method ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: 89790 Time Batched: 06:42 Time Sampled: 07:20 7 in* Air Content: 1.8 %* Unit Weight: N/A 87° F Ambient Temperature: 78° F Yardage (c.y.): 30/200 Paving: East parking and fire land Sample Location: From northeast corner of slab, 10 feet north, 20 feet east An asterisk (*) appears next to field data which does NOT meet specifications. Concrete Compression Test Results Age Max Load Area Strength Set # Cyl[gder Test Date (days) (lbs. force) (sq.in.) (psi) Fracture Type 01 DRO07280501 08/04/2005 7 94660 28.27 3350 01 DRO07280502 08/25/2005 28 97920 28.27 3460 01 DRO07280503 08/25/2005 28 100260 28.27 3550 01 DRO07280504 Hold 28 day average 35t0 Normal cylinder size: 6" x 12" The average 28 day compressive strength test results do not meet specifications. Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C'{72, C1064, and C617 or C1231. CMJ Engineering, Inc *Slump - Non-Compliant: Contractor Notified Air Content - Non-Compliant: Contractor Notified Gallons of Water Added On-Site CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our c{ient. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. o] Page I of 3