Loading...
Rozas Addn-LR050829C MJ ENGINEERING. INC. Concrete Compression Test Report 7636 Pebble Drive Fort Worth, Texas 76118 Client: Tri-Star Construction Project: Dr. Roza's Office Coppell Tel: (817) 284-9400 Fax: (817) 589-9993 Report Distribution: (1)Td-StarConstruction (1) Ci[y of Coppell CMJ Report No.: 548-5051-020 Report Date: 08/29/2005 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 07/26/2005 Slump 3 in rain 5 in max Sampled By Daniel Bohon Air Content 3 % min 6 % max Weather Cloudy/Light Winds Concrete Temperature n/a Supplier/Mix TXI/517 Ambient Temperature n/a Air Content Method ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: 88504 Time Batched: 05:35 4 in Air Content: 6.6 %* 89~ F Ambient Temperature: 83° F Paving: North and west side parking lot including west entrance Sample Location: 20 feet south, 5 feet west of the northwest corner of the building An asterisk (*) appears next to field data which does NOT meet specifications. Concrete Compression Test Results Time Sampled: 06:20 Unit Weight: N/A Yardage (c.y.): 30/300 Age Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (ps~ Type 01 DRO07260501 07/29/2005 3 66080 28.27 2340 01 DRO07260502 08/02/2005 7 94460 28.27 3340 01 DRO07260503 08/23/2005 28 114460 28.27 4050 01 DRO07260504 08/23/2005 28 114080 28.27 4030 28 day average 4040 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. *Air Content - Non-Compliant: Contractor Notified ~D Gallons of Water Added On-Site CMJ Engineering, Inc CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports ara produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the wdtten consent of our client and CMJ Engineering, Inc. 0] Page 1 of 3 C MJ ENGINEERING, INC. Concrete Compression Test Report 7636 Pebble Ddve Fort Worth, Texas 76t 18 Client: Tri-Star Construction Project: Dr. Roza's Office Coppell Tel: (817) 284-9400 Fax: (817) 589-9993 Eeport Distribution: (1) Tri-Star Construction (1) City of Coppell CMJ Report No.: 548-5051-020 Report Date: 08/29/2005 Specifications Test Data ~trtrength 4000 psi @ 28 Days Placement Date 07/26/2005 Slump 3 in min 5 in max Sampled By Daniel Bohon Air Content 3 % rain 6 % max Weather Cloudy/Light Wind Concrete Temperature n/a Supplier/Mix TXI/517 Ambient Temperature n/a Air Content Method ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 88785 Time Batched: 09:01 8 in* Air Content: 6.8 %* 91 ° F Ambient Temperature: 89° F Paving: North and west parking lot including west entrance 10 feet north and 8 feet west of northwest corner of building An astedsk (*) appeam next to field data which does NOT meet specifications. Concrete Compression Test Results Time Sampled: 09:45 Unit Weight: N/A Yardage (c.y.): 220/300 Age Max Load Area Strenclth Set # Cylinder Test Date (days) (lbs. force) (sq.in.) (ps~ 03 DRO07260509' 08/02/2005 7 66060 28.27 2340 03 DRO07260510* 08/23/2005 28 96760 28.27 3420 03 DRO07260511' 08/23/2005 28 98780 28.27 3490 03 DRO07260512 09/20/2005 56 28 day average 3460 Fracture Type Normal cylinder size: 6" x 12" The average 28 day compressive strength test results do not meet specifications. Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. * 7-DAY TEST RESULT INDICATES A MARGINAL 28-DAY COMPRESSIVE STRENGTH *Slump - Non-Compliant: Contractor Notified *Air Content - Non-Compliant: Contractor Notified O Gallons of Water Added On-Site *28-DAY TEST RESULTS NON-COMPLIANT: DALE CAIN NOTIFIED VIA FAX ON 8/23~/~~ CMJ Engineering, Inc R. Carl L~e~,..~Sd.E.T. ' R. (CMT LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. Page 3 o£ ENGINEERING, INC. Concrete Compression Test Report 7636 Pebble Drive Fort Worth, Texas 76118 Client: Tri-Star Construction Project: Dr. Roza's Office Coppell Tel: (817) 284-9400 Fax: (817) 589-9993 Report Distribution: (1)Tri-Star Construction (1) City of Coppell CMJ Report No.: 548-5051-020 Report Date: 08/29/2005 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 07/26/2005 Slump 3 in min 5 in max Sampled By Daniel Bohon Air Content 3 % min 6 % max Weather Cloudy/Light Wind Concrete Temperature n/a Supplier/Mix TXI/517 Ambient Temperature n/a Air Content Method ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 88567 Time Batched: 06:33 6.5 in* Air Content: 6.6 %* 94° F Ambient Temperature: 87° F Paving: Nor[h and west parking lot including west entrance 25 feet north and 5 feet west of face of curb on west entrance An asterisk (*) appeal next to field data which dces NOT meet specifications. Concrete Compression Test Results Time Sampled: 08:05 Unit Weight: N/A Yardage (c.y.): 110/300 Age Max Load Area Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) 02 DRO07260505' 08/02/2005 7 72780 28.27 2570 02 DRO07260506' 08/23/2005 28 116980 28.27 4140 02 DRO07260507' 08/23/2005 28 101980 28.27 3610 02 DRO07260508 09/20/2005 56 Strength Fracture (psl~ Type 28 day average 3880 Normal cylinder size: 6" x 12" The average 28 day compressive strength test results do not meet specifications. Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. * 7-DAY TEST RESULT INDICATES A MARGINAL 28-DAY COMPRESSIVE STRENGTH *Slump - Non-Compliant: Contractor Notified *28-DAY TEST RESULTS NON-COMPLIANT: DALE CAIN NOTIFIED VIA FAX ON 8/23/05. *Air Content - Non-Compliant: Contractor Notified O Gallons of Water Added On-Site CMJ Engineering, Inc R. Carl Lee, S.E.T. CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the wdtten consent of our client and CMJ Engineering, Inc. Ol Page 2 of 3