Loading...
Rozas Addn-LR050613 American Rehab & Inspections, 1NC. /~' (214) 536-2915 ---- ~--~ ~,~[c~°x- ........ LOW PRESSURE AIR TEST FOR G~VITY Test Procedures ....... k~ TESTING DIVISIO:{ Each section ol sewer snail be tested oetween successive manno~es. ~ Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reached.~t~t time the att' shall be reduced and the ~ntemal' mr' pressure shall be maintained between 3.5 and 4.5 psi~~gaug ~t~ st.~ . minutes to allow the air temperature to come to equ br um with the temperature of the p,~l~e shall be cons~ntly monitored by a gauge and hose a~angement separate from the hose used to introduce air into the line. Pressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following ~ble, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make co~ections to reduce the leakage to accep~ble limits. Line lnfi~rmation Test Results Air Test Mandrel Line Station to Station Pipe size L.F. Tested Time Passed ? Passed ? A 1+35 - 0+50 8" 80 7 MEN YES PLUG B 2+98 - 1+11 8" 184 7 MIN YES YES B 1+11 - 0+50 8" 56 7 MIN YES YES C 0+15 - 1+11 6" 3 5 MiN YES YES Contractor: Project: Location: METRO PLEX MEDICAL OFFICE FACILITY Date: 06-13-05 Job#:. Tested By: MIKE DEPAUL Inspector: GARETH CAMBELL City Of: COPPELL