Loading...
Sandy Lk Cross 2R-CS0500908COlE'FELL September 8, 2005 Mr lhomas J. \Vhan Crecksidc Construction. ltd 160 Kristcn Cane, Suite I RE: Sand.,, Lake Crossing, Lot 2R, Block REVISED Fee Assessment l,etter Dear Mr \Vhan: Enclosed ~s a rc,,ised copy of thc (7it3 tff Coppetl De,,elopment Fee Assessment table, along vdth a rc'¥iscd cop5 of Ibc Development Fcc calculations for thc referenced dcx elopment. Pkasc make payment far thc hnpact Fccs to thc City of Coppcll in thc amount t)t'$10,27874 and I'~rv, ard to thc l-nginecring Dcpanment along with a cop> of the Fcc Asscssmcnt table Ihis amount is a portion of the assessed ices that need a) be paid prior to filing of the final plat Please note that the Texas I cgislature, under Senale Bill 243, dela}ed the collection of Water and Sewer Impact Fees until the ~ssuanceoFa P, uildingPcrmi! Plcascpro,,idcacop} of thelngmccr'scstimateorconlract to our officc sothe 20, ,5: 4°'° constiuctlon inspcctxm l~c can be xcrificd 'Iht cunstiucliuninspection fees must be paid prior to thc scheduled pre-consWuchtm meeting Fine additional [bes fbr v. uter and se'~ct taps. water meters, and utilH> mspectx0n I~cs need to be paid scparatcchcck at thc new Public Works Ser~ ice Center, 816 S Coppcl] Road. Meters will be ordered when those fees arc paid .\ppropnate pa.,,mcnt of thc required fees~i[Ihclpinsurcasucccsslulbegmningofthispro, icct Welonk workingx,~ithFouonthisp~ojcct II'xou haxearlF qucstions, please contact mc ('harlene Ia Mutt~a, t I '1 (haduatc I ngmecr Jcnnifur Armstrong, }'inance Director Mar} Beth Splctzcr. Administrative Sccrctar}. Building lnspecttnns Glenn [Iollox~.ell, Assistant l)irccror of Public Works (~rcg Jones. Chic~ Building Official lhad Reid, [)irocVeF of I'a~ks and Recreation DEVELOPMENT FEE TABLE Project: Sandy Lal~e Crossing, Lot 2R, Blocl~ l Date: 9/8/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $3.500.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $140.78 (100% due at lssuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $4,682.03 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at lssuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater lmpact Fee $1,400.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway lmpact Fee $10,278.74 $10,278.74 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee lntbrmation not Available (100% due prior to Start of Construction) FOTAL $20,341.55 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $10,278.74 DEVELOPMENT FEE WORKSHEET PROJECT: Sandy Lake Crossing, Lot 2R, Blocl~ 1 DATE: 9/8/2005 Water Impact Fee: Domestic Meter(s): irrigation Meter(s): Fireline Meter(s): 1 - I 1/2 inch = 5 ESU's 1 - 1 1/2 inch = 5 ESU's 0 = 0 ESU's I - 8 inch = 25 ESU's Total#: 125 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $140.78 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $140.78 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $4,541.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 (Due prior to issuance of building permit) $280.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $5000 ea (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $3,500.00 $150.00 $140.78 $140.78 $0.0o $4,541.25 $30.00 $60.00 $1,400.00 $50.00 $50.00 Park Fee (For Residential Developments Only): Page I DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) SQ00 $0.00 $10,278.74 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROA~ NAY IMPACT FEE CALCUL^, IONS PROJECT: DATE: Sand. v Lake Crossing, tot 2R, Block 1 9/8/2005 ROADWAY IMPACT FEE: Service Area * 5 Category ** Conrmercial Land Use ** Commercial Others Not Specified Building Area (sO 7.198 Development Units ** 7.20 Vehicle Miles per Development Unit ** 4.76 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (De'~clopment Units) x [(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) ~ $10,278.74 * (Figure 2 - Roadway hnpact Fee Study') ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Pagc 3 - Roadway impact Fee Stud)') I AMOUNTDUE: $10,278.74