Sandy Lk Cross 2R-CS0500908COlE'FELL
September 8, 2005
Mr lhomas J. \Vhan
Crecksidc Construction. ltd
160 Kristcn Cane, Suite I
RE: Sand.,, Lake Crossing, Lot 2R, Block
REVISED Fee Assessment l,etter
Dear Mr \Vhan:
Enclosed ~s a rc,,ised copy of thc (7it3 tff Coppetl De,,elopment Fee Assessment table, along vdth a
rc'¥iscd cop5 of Ibc Development Fcc calculations for thc referenced dcx elopment.
Pkasc make payment far thc hnpact Fccs to thc City of Coppcll in thc amount t)t'$10,27874 and I'~rv, ard
to thc l-nginecring Dcpanment along with a cop> of the Fcc Asscssmcnt table Ihis amount is a portion of
the assessed ices that need a) be paid prior to filing of the final plat Please note that the Texas
I cgislature, under Senale Bill 243, dela}ed the collection of Water and Sewer Impact Fees until the
~ssuanceoFa P, uildingPcrmi! Plcascpro,,idcacop} of thelngmccr'scstimateorconlract to our officc
sothe 20, ,5: 4°'° constiuctlon inspcctxm l~c can be xcrificd 'Iht cunstiucliuninspection fees must be
paid prior to thc scheduled pre-consWuchtm meeting
Fine additional [bes fbr v. uter and se'~ct taps. water meters, and utilH> mspectx0n I~cs need to be paid
scparatcchcck at thc new Public Works Ser~ ice Center, 816 S Coppcl] Road. Meters will be ordered
when those fees arc paid
.\ppropnate pa.,,mcnt of thc required fees~i[Ihclpinsurcasucccsslulbegmningofthispro, icct Welonk
workingx,~ithFouonthisp~ojcct II'xou haxearlF qucstions, please contact mc
('harlene Ia Mutt~a, t I '1
(haduatc I ngmecr
Jcnnifur Armstrong, }'inance Director
Mar} Beth Splctzcr. Administrative Sccrctar}. Building lnspecttnns
Glenn [Iollox~.ell, Assistant l)irccror of Public Works
(~rcg Jones. Chic~ Building Official
lhad Reid, [)irocVeF of I'a~ks and Recreation
DEVELOPMENT FEE TABLE
Project: Sandy Lal~e Crossing, Lot 2R, Blocl~ l
Date: 9/8/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $3.500.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $140.78
(100% due at lssuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $4,682.03
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at lssuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater lmpact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway lmpact Fee $10,278.74 $10,278.74
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee lntbrmation not Available
(100% due prior to Start of Construction)
FOTAL $20,341.55
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $10,278.74
DEVELOPMENT FEE WORKSHEET
PROJECT: Sandy Lake Crossing, Lot 2R, Blocl~ 1
DATE: 9/8/2005
Water Impact Fee:
Domestic Meter(s):
irrigation Meter(s):
Fireline Meter(s):
1 - I 1/2 inch = 5 ESU's
1 - 1 1/2 inch = 5 ESU's
0 = 0 ESU's
I - 8 inch = 25 ESU's
Total#: 125 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $140.78
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $140.78
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $4,541.25
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5
(Due prior to issuance of building permit)
$280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $5000 ea
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$3,500.00
$150.00
$140.78
$140.78
$0.0o
$4,541.25
$30.00
$60.00
$1,400.00
$50.00
$50.00
Park Fee (For Residential Developments Only):
Page I
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
SQ00
$0.00
$10,278.74
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROA~ NAY IMPACT FEE CALCUL^, IONS
PROJECT:
DATE:
Sand. v Lake Crossing, tot 2R, Block 1
9/8/2005
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Conrmercial
Land Use ** Commercial Others Not Specified
Building Area (sO 7.198
Development Units ** 7.20
Vehicle Miles per Development Unit ** 4.76
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (De'~clopment Units) x
[(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) ~ $10,278.74
* (Figure 2 - Roadway hnpact Fee Study')
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Pagc 3 - Roadway impact Fee Stud)')
I AMOUNTDUE: $10,278.74