Loading...
Sandy Lk Cross 2R-CS050908COPPELL 160 Krislen I.anc. Suite ] ~ RI~: Sand) Lake Crossing, l.o~ 2R, 8lock i September g, 2005 Dc,~r Mr ~.~,'han: t{ndosed is a rcxiscd cop? of thc (7il3 of (.:oppcll l)evelopmel'd Fee Assessment table, along with ~c'.,~sect cop5 oI the L)e~,clopn:ent [.cc calculations lbr thc refc'reqced dc: elopment Please. make payment for thc Impact t~:ecs !o thc City of (?oppcl': m thc amount of$10.278 74 and lbrward to thc lin?meting I)¢par~ment along ~ilh a cop) of the Fcc Asscssmcnl table, l'his amount is a potion of thc asscsscd fees that need to hc paid prior 1o f~ling of the final Nut. Please note lhat (he Texas I,cgislature. under Senate Bill 243. delayed the cullecmm of' Water and Sc~,cr Impact Fees until ~ssuance ora Building Permit Please p]-o~id¢ a copy of the } ngmeer'> estimate or contracl lo our office ~o thc 2% & 4% conslruct~on mspccti{,n fcc can bc vcrificci I lie CtnlSfftlCliOll inspection IDes rllus{ bc pa~d prior to thc scheduled prc-conslruclmn meeting ]hu Jddilionai 1~'c5 for u. ater and sex,,'c~ taps, x*alcr meters, and utili{} m~pectJon fees need to be paid bv separate cbcck m the new Public Works Service Comer. 816 S Coppcl[ Road Meters will bc ordered xq~en those fees are paid Appropriate pa} merit o[ thc required lees x~i[I help insmc a succc,;sf'ul beginning of this project t~rv, ard tc) working x~.lth }ou on l}]is projcct [[}ou ha;c an} questions, ;)lease c'ontact mc Nincercl}, ('hurlcne [ a Mat~/e{~a. l( I I (;raduatc [:ngmcer CL'¸ ,lctlni~:r .,\rm,%tlong, I inance I)ircctor Marx Bcth Xplelzur. ,,\chnmlslratlve Secretar}. Building Inspections (ilenn [lollox~cll. ,Xsslslanl [)lrcctor of Public Works (;rcg Jones. Chief Building ()fticiai DEVELOPMENT FEE TABLE Project: Sandy Loire Crossing, Lot 2R, Block I Date: TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $3,500.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $140.78 (100% due at Issuance of Water Meter) Water Meter Fee (lrrigation/Fireline) $4,682.03 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) lrrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,400.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (I00% due at lssuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway lmpact Fee $10,278.74 $10,278.74 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) fOTAL $20,341.55 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $10,278.74 DEVELOPMENT FEE WORKSHEET PROJECT: Sandy Lake Crossing, Lot 2R, Block 1 DATE: 9/8/2005 Water Impact Fee: Domestic Meter(s): irrigation Meter(s): Fireline Meter(s): 1 - 1 1/2 inch 5 ESU's I - 1 1/2 inch = 5 ESU's 0 0 ESU's 1 - 8 inch 25 ESU's Total#: 125 ESU's@$280.00ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $140.78 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $140.78 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $4,541 25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 (Due prior to issuance of building permit) @ $28000 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $5000 ea. (100% due prior to issuance of building permit) Utili~ Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $3,500.00 $150.00 $140.78 $14Q78 $0.00 $4,541.25 $3Q00 $60.00 $1,4OO.OO $50.00 $50.00 Park Fee (For Residential Developments Only): Page I DEVELOPMENT FEE WORKSHEET * Prelimiuary plat approved: After October 26, 1993 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $10,278.74 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Depadment. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROA~ NAY IMPACT FEE CALCULA, IONS PROJECT: Sandy Lake CrosMng, I. ot 2R, Block 1 DAlE: 9/8/2005 ROADWAY IMPACT I:EE: Service Area * 5 Category ** Commercial kand Use ** ( ommercial Others Not Specified Building Area (si) 7,198 Development Units ** 7.20 Vehicle Miles pet Devclopmem Unit ** 4.76 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Veh c e M es per Development Unit) x (Fee per Vehicle Mile) -: $10,278.74 * (Figure 2 - Roadu, ay Impact Fee Study') ** (Table 3 - Roadway hnpact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) ~ AMOUNTDUE: $10,278.74 ~