Sandy Lk Cross 2R-CS050908COPPELL
160 Krislen I.anc. Suite ] ~
RI~: Sand) Lake Crossing, l.o~ 2R, 8lock i
September g, 2005
Dc,~r Mr ~.~,'han:
t{ndosed is a rcxiscd cop? of thc (7il3 of (.:oppcll l)evelopmel'd Fee Assessment table, along with
~c'.,~sect cop5 oI the L)e~,clopn:ent [.cc calculations lbr thc refc'reqced dc: elopment
Please. make payment for thc Impact t~:ecs !o thc City of (?oppcl': m thc amount of$10.278 74 and lbrward
to thc lin?meting I)¢par~ment along ~ilh a cop) of the Fcc Asscssmcnl table, l'his amount is a potion of
thc asscsscd fees that need to hc paid prior 1o f~ling of the final Nut. Please note lhat (he Texas
I,cgislature. under Senate Bill 243. delayed the cullecmm of' Water and Sc~,cr Impact Fees until
~ssuance ora Building Permit Please p]-o~id¢ a copy of the } ngmeer'> estimate or contracl lo our office
~o thc 2% & 4% conslruct~on mspccti{,n fcc can bc vcrificci I lie CtnlSfftlCliOll inspection IDes rllus{ bc
pa~d prior to thc scheduled prc-conslruclmn meeting
]hu Jddilionai 1~'c5 for u. ater and sex,,'c~ taps, x*alcr meters, and utili{} m~pectJon fees need to be paid bv
separate cbcck m the new Public Works Service Comer. 816 S Coppcl[ Road Meters will bc ordered
xq~en those fees are paid
Appropriate pa} merit o[ thc required lees x~i[I help insmc a succc,;sf'ul beginning of this project
t~rv, ard tc) working x~.lth }ou on l}]is projcct [[}ou ha;c an} questions, ;)lease c'ontact mc
Nincercl},
('hurlcne [ a Mat~/e{~a. l( I I
(;raduatc [:ngmcer
CL'¸
,lctlni~:r .,\rm,%tlong, I inance I)ircctor
Marx Bcth Xplelzur. ,,\chnmlslratlve Secretar}. Building Inspections
(ilenn [lollox~cll. ,Xsslslanl [)lrcctor of Public Works
(;rcg Jones. Chief Building ()fticiai
DEVELOPMENT FEE TABLE
Project: Sandy Loire Crossing, Lot 2R, Block I
Date:
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $3,500.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $140.78
(100% due at Issuance of Water Meter)
Water Meter Fee (lrrigation/Fireline) $4,682.03
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(I00% due at lssuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway lmpact Fee $10,278.74 $10,278.74
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
fOTAL $20,341.55
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $10,278.74
DEVELOPMENT FEE WORKSHEET
PROJECT: Sandy Lake Crossing, Lot 2R, Block 1
DATE: 9/8/2005
Water Impact Fee:
Domestic Meter(s):
irrigation Meter(s):
Fireline Meter(s):
1 - 1 1/2 inch 5 ESU's
I - 1 1/2 inch = 5 ESU's
0 0 ESU's
1 - 8 inch 25 ESU's
Total#: 125 ESU's@$280.00ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $140.78
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $140.78
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $4,541 25
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $3000 ea
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5
(Due prior to issuance of building permit)
@ $28000 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $5000 ea.
(100% due prior to issuance of building permit)
Utili~ Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$3,500.00
$150.00
$140.78
$14Q78
$0.00
$4,541.25
$3Q00
$60.00
$1,4OO.OO
$50.00
$50.00
Park Fee (For Residential Developments Only):
Page I
DEVELOPMENT FEE WORKSHEET
* Prelimiuary plat approved:
After October 26, 1993
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$10,278.74
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U Electric submits
the lighting plan for the proposed development
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Depadment.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROA~ NAY IMPACT FEE CALCULA, IONS
PROJECT: Sandy Lake CrosMng, I. ot 2R, Block 1
DAlE: 9/8/2005
ROADWAY IMPACT I:EE:
Service Area * 5
Category ** Commercial
kand Use ** ( ommercial Others Not Specified
Building Area (si) 7,198
Development Units ** 7.20
Vehicle Miles pet Devclopmem Unit ** 4.76
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Veh c e M es per Development Unit) x (Fee per Vehicle Mile) -: $10,278.74
* (Figure 2 - Roadu, ay Impact Fee Study')
** (Table 3 - Roadway hnpact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
~ AMOUNTDUE: $10,278.74 ~