Loading...
ST9703-LR050902Rone Engineenng 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX '76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 MacArthur Boulevard Widening ST 97-03 Report No.: 238985 Project No.: 0510377 Date of Service: 08/04/2005 Report Date: 09/02/2005 Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: JRJ Paving CONCRETE SUPPLIER: LMC PLANT: 7 SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" nlaxirntlm 3% - 6% ASTM C-! 72 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN 1.D.: ]70] SLUMP PLACEMENT DATE: 08/04/2005 (inches) WEATHER CONDITIONS: Clear 3.5 TIME SAMPLED: 7:35am BATCHTIME: 6:42am TEMPERATURE (F) - AIR 75 F CONCRETE: 84 F TRUCKNO: 5016 TICKETNO: 7155119 AIR CONTENT (%): 4.3 UNIT WEIGHT (pcft: NA OVERALL PLACEMENT LOCATION: Stamped concrete, intersection of McArthur Boulevard and Riverchase Boulevard, north side of intersection on MeArthur Boulevard SAMPLE LOCATION: See below REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAX[MUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 08/08/2005 4 6.00 28.26 103930 3680 Unbonded Cap 1 2 08/11/2005 7 6.00 28.26 108560 3840 Unbonded Cap 1 3 09/01/2005 28 6.00 28.26 137800 4870 Unbonded Cap 1 4 09/01/2005 28 6.00 28.26 137430 4860 Unbonded Cap Average 4870 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for var/ation in quality (composition, appearance, etc ) or any other feature of similar subject ma~¢r provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd Page I of 2 Rone Engineering Report No.: 238985 ~llllll~l Project No.: 0510377 Client: City of Coppell Sample Location: 17' south of center mediam, curb on north side of intersection Technician: Pat P~ksReport(1) Ci~ of CoppellDistributi°n: Started: 6:30~ Finished: 9:15~ :~~ , . _ (I) Ci~ of Coppell CMT Operations M~er LIM/TATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject mauer provided by persons or conditionsi over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fuji without the written approval of Rone Engineering Services, Ltd Page 2 of 2 ?:{one Engineenng 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 MacArthur Boulevard WidenLng ST 97-03 Report No.: 238913 Project No.: 0510377 Date of Service: 08/03/2005 Report Date: 09/02/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: JRJ Paving CONCRETE SUPPLIER: LMC PLANT: 6 SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: 1701 PLACEMENT DATE: 08/03/2005 WEATHER CONDITIONS: S uBIly TIME SAMPLED: 9:45am BATCH TIME: TEMPERATURE (F) - AIR 85 F CONCRETE: 94 F TRECK NO: 1091 TICKET NO: 6257117 A1R CONTENT (%): 4.4 UNITWEIGHT(pc0: NA OVE1LALL PLACEMENT LOCATION: Median bead at end of each median and curb, MacArthur SAMI'LE LOCATION: REPORT OF TESTS North median head, crossover at MacArthur & Pdverchase entrance MEASURED SLUMP (inches) 2.5 Concrete Compressive Cylinder 6" x 12" C~INDER MARKED DATE SET NO. TESTED AGE DIAMETER ~..EA (days) (inches) (sq.in.) MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 1 1 08/06/2005 1 2 08/10/2005 1 3 08/31/2005 I 4 08/31/2005 See Repor~ %238912 for time. Technician: Jack Roberts Report Distribution: (1) CiD' of Coppell (1) CiD' of Coppell 3 6.00 28.26 104160 7 6.00 28.26 111410 28 6.00 28.26 139590 28 6.00 28.26 143640 Average Started: Finished: 3680 Unbonded Cap 3940 Unbonded Cap 4940 Unbonded Cap 5080 Unbonded Cap 5010 K. Scott Watson, AET CMT Operations Manager LINYITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We a~sume no responsibility for variation in quality (composition, appearance, etc ) or any other feature of similar subject mat~er provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineering Services, Ltd. Page 1 of 1 i{one Engineenng 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive~ Fort Worth, TX 76118 6300 Rarhway, Stp. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 Report No.: 238912 Project No.: 0510377 Date of Service: 08/03/2005 Report Date: 09/02/2005 MacArthur Boulevard Widening ST 97-03 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: JRJ Paving CONCRETE SUPPLIER: LMC pLANT: 7 SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: 1701 PLACEMENT DATE: 08/03/2005 WEATHER CONDITIONS: Sunny T1MESAMPLED: 8:10alIl BATCHT1ME: 6:35am TEMPERATURE (F) - AIR 82 F CONCRETE: 95 F TRUCK NO: 1093 TICKET NO: 7155057 AIR CONTENT (%): 4.6 UNITWEIGHT(pc0: NA O~rERALL PLACEMENT LOCATION: Cross walks across MacArthur and Riverchase SAMPLE LOCATION: REPORT OF TESTS South side of intersection southbound MacArthur SLUMP (inches) 3.0 Concrete Compressive Cylinder 6" x 12" CYLINDER 1VLS, RKED DATE SET NO. TESTED AGE DIAMETER (days) (inches) MA~V~IMUM COMPRESSIVE AREA LOAD STRENGTH (sq.in.) (lbs. force) (psi) FRACTURE TYPE 1 1 08/06/2005 1 2 08/10/2005 1 3 08/31/2005 I 4 08/31/2005 Technician: Jack Roberts Report Distribution: (1) City of Coppell (1) City of Coppell 3 6.00 28.26 102030 3610 7 6.00 28.26 123710 4370 28 6.00 28.26 148210 5240 28 6.00 28.26 143560 5080 Average 5160 Started: 6:30am Finished: 10:45am Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap K. Scott Watson, AET CMT Operations Manager 0X LllvlITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc ) or any other feature of similax subject roamer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wntton approval of Rone Engineering Services, Ltd. Page I of 1