Loading...
Hard 8 BBQ-CS050914 1 1. Conneclions to existing water lines should be made by dry bore using steel casings. 12. Locate the DDC xaults so that they do not interfere with the placement of side~,valks and ADA ramps. 13. Installation of the sanitary sewer up to the manhole should be by dry bore. Provide a detail for the repair of the asphalt removed by sawcut. 14. Provide sanitary sewer profiles. PaYing Plan, C5.1 15. Ensure that the future Bethel Road improvements arc shown correctly in the set. The location where the "Extent of Future Proposed Pavement" adjoins Freeport Parkway does not appear to be correct. 16. Provide sidewalk easements to accommodate ADA Ramps. The easements should allow the connection of the future proposed sidewalk and thc proposed bands of stamped concrete. Construct the ADA Ramps with this development. 17. The drive approach from Freeport Parkway should be concrete construction according to City of Coppcll Standard Details. Erosion Control Plan, C6.1 18. Show the location of the construction entrance. Please make the necessary changes and submit these marked-up plans and two sets of revised plans to thc City for review. If you have any questions, please contact this office at your convenience. Sincerely, Charlene La M~ttina, E.I.T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-7041