Loading...
Vista Ridge 1R-8 D-LR050912SAM ENG NEEmNG & TESTING, INC. Serving The Geo-lndustry Since 1974 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 Gevtechnical CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT CLIENT: JBP, LP STANDARD 6"X 12" 5301 Village Creek Drive, Suite A AREA 28.27 SQ. IN. Piano, TX 75093 ~ ~-- ......... ~ ~,.~'1~('· REPORT DATE: 9/12/05 ~Plaza Infrastructu re ~, PROJECT: ~["~1 "'' SAMPLE DATE: 9/9/05 Lewisville & Coppell, TX PROJECT NO.: 308TXlK5 ATTN: Neal Heckel REPORT NO.: 25 SE&T TECHNICIAN: Brian Taylor LOCATION OF PLACEMENT: Aproach - Villa Lane {~ Rid~emont PAGE 1 OF 2 Time Arrived: 2:00 PM Concrete Supplier: TXI Time Left: 5:00 PM Ticket #: C698079 Slump (inches): 4.5 Truck #: 831 Concrete Temperature (F): 90 Time Batched: 12:45 PM % Air Content: 1.2 Time Sampled: 2:10 PM Total No. of Test Cylinders Made: 4 Product Code: B8274 Total Cubic Yards Placed: 8 Cement: N/A Added Water: 10 Gallons Fly Ash: N/A Weather Conditions: Hot & Sunny Coarse A~l~re~late: N/A Air Temperature (F): 95 Water: N/A Unit Wei~lht of Fresh Concrete: 145 % Air Content: N/A lA 7 9/16/05 4000~28 1 B 14 9/23/05 4000128 1 C 28 10/7/05 4000/28 1 D 28 10~7~05 4000~28 Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By: Slump ASTM C-143 ASTM C-39 & 231 SE&T Remarks: Very Truly Yours, Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report only applies to the samples tested and does not necessarily represent identical or similar samples. G:120051308txik51CpistrlCpistr25/SF SAM ENGiNEERiNG & TEs ' .G, 1~ Serving The Goo-Industry Since 1974 '~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910. FAX: (972) 790-0967 Geotechnical Enviror~mentaJ CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT CLIENT: JBP, LP STANDARD 6" X 12" 5301 Village Creek Drive, Suite A AREA 28.27 SQ. IN. Piano, TX 75093 REPORT DATE: 9/12/05 PROJECT: The Plaza Infrastructure Highway 121 & Ridgemont SAMPLE DATE: 9/9/05 Lewisville & Coppell, TX PROJECT NO.: 308TXlK5 ATTN: Neal Heckel REPORT NO.: 25 SE&T TECHNICIAN: Brian Taylor LOCATION OF PLACEMENT: Top of Man Hole Inlet ~ Westbound 121 PAGE 2 OF 2 Time Arrived: 2:00 PM Concrete Supplier: LMC Time Left: 5:00 PM Ticket #: 7156323 Slump (Inches): 3.75 Truck #: 1125 Concrete Temperature (F): 89 Time Batched: 3:05 PM % Air Content: 1.6 Time Sampled: 3:40 PM Total No. of Test Cylinders Made: 8 Product Code: 1701 Total Cubic Yards Placed: 6 Cement: N/A Added Water: 0 Fly Ash: N/A Weather Conditions: Hot & Sunny Coarse A~gregate: N/A Air Temperature (F): 98 Water: N/A Unit Weight of Fresh Concrete: 146 % Air Content: N/A 2A 7 9/16/05 4200/28 2B 14 9~23~05 4200~28 2C 28 10/7/05 4200/28 2D 28 10/7/05 4200/28 Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By: Slump ASTM C-143 ASTM C-39 & 231 SE&T Remarks: Very Truly Yours, Sadik (SAM) AI-Musawe, M.Sc., PhD., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent, This report only applies to the samples tested and does not necessarily represent identical or similar samples. G:120051308txik51CpistrlCpistr251SF