Vista Ridge 1R-8 D-LR050912SAM ENG NEEmNG & TESTING, INC.
Serving The Geo-lndustry Since 1974
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
Gevtechnical
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT: JBP, LP STANDARD 6"X 12"
5301 Village Creek Drive, Suite A AREA 28.27 SQ. IN.
Piano, TX 75093 ~
~-- ......... ~ ~,.~'1~('· REPORT DATE: 9/12/05
~Plaza Infrastructu re ~,
PROJECT:
~["~1 "'' SAMPLE DATE: 9/9/05
Lewisville & Coppell, TX
PROJECT NO.: 308TXlK5
ATTN: Neal Heckel
REPORT NO.: 25
SE&T TECHNICIAN: Brian Taylor
LOCATION OF PLACEMENT: Aproach - Villa Lane {~ Rid~emont PAGE 1 OF 2
Time Arrived: 2:00 PM Concrete Supplier: TXI
Time Left: 5:00 PM Ticket #: C698079
Slump (inches): 4.5 Truck #: 831
Concrete Temperature (F): 90 Time Batched: 12:45 PM
% Air Content: 1.2 Time Sampled: 2:10 PM
Total No. of Test Cylinders Made: 4 Product Code: B8274
Total Cubic Yards Placed: 8 Cement: N/A
Added Water: 10 Gallons Fly Ash: N/A
Weather Conditions: Hot & Sunny Coarse A~l~re~late: N/A
Air Temperature (F): 95 Water: N/A
Unit Wei~lht of Fresh Concrete: 145 % Air Content: N/A
lA 7 9/16/05 4000~28
1 B 14 9/23/05 4000128
1 C 28 10/7/05 4000/28
1 D 28 10~7~05 4000~28
Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By:
Slump ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
Very Truly Yours,
Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samples.
G:120051308txik51CpistrlCpistr25/SF
SAM ENGiNEERiNG & TEs ' .G,
1~ Serving The Goo-Industry Since 1974 '~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910. FAX: (972) 790-0967
Geotechnical
Enviror~mentaJ
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT: JBP, LP STANDARD 6" X 12"
5301 Village Creek Drive, Suite A AREA 28.27 SQ. IN.
Piano, TX 75093
REPORT DATE: 9/12/05
PROJECT: The Plaza Infrastructure
Highway 121 & Ridgemont SAMPLE DATE: 9/9/05
Lewisville & Coppell, TX
PROJECT NO.: 308TXlK5
ATTN: Neal Heckel
REPORT NO.: 25
SE&T TECHNICIAN: Brian Taylor
LOCATION OF PLACEMENT: Top of Man Hole Inlet ~ Westbound 121 PAGE 2 OF 2
Time Arrived: 2:00 PM Concrete Supplier: LMC
Time Left: 5:00 PM Ticket #: 7156323
Slump (Inches): 3.75 Truck #: 1125
Concrete Temperature (F): 89 Time Batched: 3:05 PM
% Air Content: 1.6 Time Sampled: 3:40 PM
Total No. of Test Cylinders Made: 8 Product Code: 1701
Total Cubic Yards Placed: 6 Cement: N/A
Added Water: 0 Fly Ash: N/A
Weather Conditions: Hot & Sunny Coarse A~gregate: N/A
Air Temperature (F): 98 Water: N/A
Unit Weight of Fresh Concrete: 146 % Air Content: N/A
2A 7 9/16/05 4200/28
2B 14 9~23~05 4200~28
2C 28 10/7/05 4200/28
2D 28 10/7/05 4200/28
Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By:
Slump ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., PhD., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent,
This report only applies to the samples tested and does not necessarily represent identical or similar samples.
G:120051308txik51CpistrlCpistr251SF