Loading...
Brighton Manor-CS050915COl'FELL September 15, 2005 Rodney Louvicre Dowdey, Anderson & Associates, Inc. 5225 Village Creek Drive, Suite 200 Plano, TX 75093 RE: Brighton Manor (Falls at Wcstmont) Erosion Control Dear Mr. Louviere: Representatives from the City of Coppell observed during a rainfall event today that the erosion control structures previously installed at the referenced site are now nonexistent. As a result of this rainfall the streets surrounding Brighton Manor are covered with silt that is and will be entering thc storm drains in the vicinity. The City is holding a cash erosion control bond and will not hesitate to use it on an emergency basis to control the massive erosion and run-offof silt from the subdivision. It is imperative that yon re-install and maintain your erosion control devices according to your erosion control plan. Please make the necessary corrections immediately and contact me when they are complete. If you have any questions, please contact me at (972) 304- 7044. Sincerely, Keith Marvin, P.E. Civil Engineer Office: 972/304-7044 Fax: 972/304-3570 kmarvin(r~ci.coppcll.lx.us CC: Ken Griffin, P.E., Director of Engineering & Public Works Larry Davis, Construction Inspector Jim Street, Street Custom Homes Scott Caruthers, P.E., Dowdcy, Anderson & Associates Shane Isbell, TCEQ Region 4