Vista Ridge 1R-8 D-LR050916SAM ENGINEERING TESTING, INC.
1~ Serving The Geo-lndustry Since 1974 .~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
IN-PLACE DENSITY OF SOIL
Geotechnical
CLIENT:
JBP, LP
5301 Village Creek Drive, Suite A
Piano, TX 75093
PROJECT:
The Plaza Infrastructure
Highway 121 & Ridgemont
Lewisville & Coppell, TX
PROJECT #: 308TXIK6
ATTN: Neal Heckel
REPORT DATE: 9/'16/05 I ~-~ I DATE:
TEST METHOD:ASTMD-2292 & 3017
*ASTM D698A - See Proctor Report for Details
Minimum Required Compaction = 95%
REPORT#: 28 PAGE 1 OF I
SE&T TECHNICIAN: nac
9/15/05
104 106
101 106
103 106
All densities meet the minimum required values unless otherwise noted. It has been a pleasure to serve you on this
project and we trust that this report is satisfactory.
Very Truly Yours,
SAM Engineering & Testing, L.P.
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893