Loading...
ST9905-CS050921COPPELL September 21, 2005 Mr. Craig Bond, P.E. TransSystems Corporation 3010 LBJ Freeway, Suite 990 Dallas, Texas 75234 RE: Bethel Road I ST 99-05 Pacheco Koch / Duke Construction Drainage Request Dear Mr. Bond: The city has reviewed your letter dated September 13, 2005 regarding Duke Construction's request to discharge storm water from the parking lot of two proposed buildings into the currently designed drainage system for Bethel Road. Your findings indicate that the proposed storm water discharge can be accommodated through the upsizing of Line D and that the 25-year capacity of the four 10' x 5' box culverts is sufficient to handle the additional flows. The city has no objections to TranSystems upsizing Line D to accommodate the storm drain water from the proposed development. It is understood that Duke Construction is responsible for TranSystem's engineering costs associated with the upsizing of Line D and for all revisions to the Bethel Road I construction plans related to proposed development. The city will need to review the revisions prior to the plans being finalized. Should you have any questions or need any additional information, please advise. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office: 972/304-3686 Fax: 972/304-7041 E-mail: kgriffin~ci.coppell.tx.us Bruce Barclay, Duke Construction C. Jack Evans, P.E., Pacheco Koch 255 PARKWAY ~ p.O.BOX 9478 ~ COPPELL TX 75019 ~ TEL 972/462 0022 W FAX 972/304 3673