Loading...
Vista Ridge 1R-8 D-CS050915I Keiib MarVin - FW: The Plaza Decel Lane From: To: Date: Subject: "Casey Ross" <cross@daa-civil.com> "Neal Heckel" <nealheckel@sbcglobal.net> 9/15/2005 11:46:52 AM FW: The Plaza Decel Lane FYI .age 11 From: Carla Bates [mailto:CBATES@dot.state.tx.us] Sent: Thursday, September 15, 2005 8:52 AM To: Casey Ross Subject: Re: The Plaza Decel Lane Good Morning Casey! It is OK to go ahead and build the modified pavement section. Carla >>> "Casey Ross" <cross@daa-civil.com> 9/14/2005 4:22 PM >>> Carla, I know you remember the conversations we've had about the existing franchise utilities located at The Plaza· Gilco is our paving contractor on the job. They are preparing to pour the deceleration lane along State Highway 121. They are trying to create as much cover over top of the existing conduit on site as possible. Per our approved · " ' r 4 construction plans, w.e,,have called out a 10 concrete sechon ove a as~.~,~lt section over~" of lime stabilized su~grade~Ta~co discussec~=' w~r,~k3son Wee-'i~-the option of construction ~(,~0.~concrete section over a(.8~asphalt section with no lime subgrade..T~on has agreed to the moc~'rcation, but I was also asked to check with you for your approval. Gilco is going to begin construction soon. Please let me know your opinion on the situation as soon as possible. Thanks, Casey Ross Dowdey, Anderson & Assoc.,Inc. 972-931-0694 cross@daa-civil.com CC: "Keith MarVin" <kmarvin@ci.coppell.tx.us>, "Charlene LaMattina"