Loading...
ST9302-LR 990804A REPORT OF FIELD ALPHA TESTING, lNC. OMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 9721620 -8911 - 9721263 -4937 (Metro) FAX 9721406 -8023 TESTED FOR CITY OF COPPELL COPPELL, TEXAS PROJECT SANDY LAKE ROAD PROJECT NO. ST 93 -02 COPPELL, TEXAS TEST DATA: DATE 8/4/99 OUR REPORT NO. 98881 -52 (EST NO, DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* 164 8/4/99 FG -6.0 7 21.5 99.6 25.5 95 95 1 -A 165 8/4/99 FG -5.0 6 12.5 1 1 1.2 14.6 108 97 1 -A 166 8/4/99 FG -4.0 6 12.5 1 1 1.2 14.5 110 99 1 -A 167 8/4/99 FG -3.0 7 21.5 99.6 23.7 95 96 1 -A 168 8/4/99 FG -2.0 6 12.5 111.2 14.9 108 97 1 -A 169 8/4/99 FIG 5 13.5 111.9 14.2 112 100 1 -A TFST 1 r1CATInN- �� 164 1 30" WATER LINE AT STATION #57 +30 165 30" WATER LINE AT STATION #57 +20 166 30" WATER LINE AT STATION #57 +15 167 30" WATER LINE AT STATION #57 +05 168 30" WATER LINE AT STATION #57 +00 169 30" WATER LINE AT STATION #56 + 95 1. FILI A. IN PLACE PEHCENI MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST - 7 pectfully Sy�b I ed C AL�HA TESTING, i Geotechnical Engineering ■ Corutruciion Materials Testing ■ Environmental Engineering ■ Consufhng