Loading...
All Care-CS 970224The City With A Beautiful Future P.O. Box 478 Coppel], Texas 75019 214-462-0022 February 24, 1997 Greg Weber All Care Veterinary Clinic 110 W. Sandy Lake Rd. Coppell, TX 75019 All Care Veterinary Clinic Development Fee Assessment Dear Mr Weber: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $7,283.44 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~) K~t~'~n: P.E. Director of Public Works/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: All Care Veterinary Clinic Date: 2/24/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $48.30 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $48.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% clue prior to Council Approval) Roadway Impact Fee $3,908.44 $3,908.44 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $7,645.04 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,283.44 DEVELOPMENT FEE WORKSHEET PROJECT: All Care Veterinary Clinic DATE: 2/24/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch = 2.5 1 - 1 inch 0 - N/A = 2.5 Total #: 5 ESU's @ 9450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $48.30 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $48.30 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ 035.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 2.5 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ 950.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 1 Lots @ 950.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $2,250.00 $100.00 $48.3O $48.30 $0.00 $0.00 930.00 935.00 $1,125.00 $50.00 950.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ 0150.00 / Lot Multi-family @ 075.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ 0350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ 01285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A 03,908.44 Information not available at this thne Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 PROJECT: DATE: All Care Veterinary Clinic 12/3/96 ROADWAY IMPACT FEE: ;ervice Area * Cat~8ory ** _and Use ** Bnildil~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Developmem Unit ** Fee ~er Vehicle Mile *** Roadway Impact Fee due -- (Development Units) x ',Vehicle Miles Der Development Uni0 x (Fee Der Vehicle Mile) I Others / Not Specified (Commercial) 2,737 2.737 4.76 $3OO $3,~08.44 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)