Loading...
Amberpoint-CS020802 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Construction Inspector Danny Hightower, Utilities Maintenance ~)~ / ~p August 2, 2002 Northpoint Drive Walk-thru, August 1 & 2, 2002 1. All okay for Utilities ONLY. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 08/02/02 12:~? ID=CITY OF COPPELL DATE 08×02 S~R-TIME DISTANT STATION ID 00~24'' 9?2 ~04 7041 MODE PAGES RESULT CALLING 01 OK 0000 From: Rhonda Brothers To: walkthru group Date: 7/30/02 12:41 PM Subject: Northpoint Drive Per Larry Davis - a final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for Thursday, August 1, 2002 at 8:30 a.m. Rhonda Brothers Engineering Dept. Secretary Issued: Name: Phone Number (FLM): Finished: WATER Employee: ~}q[/ Grid Map: Address: DO (WK): Check For: Accuracy Test Meter Leak Initial Meter Relocation Inspections I. Backflow Insp. Backflow Insp. Bkfiow Cert. Date Re-Cert. Date Check Water Pressure Re-Read 2. Repair 3. Maintenance 4. Other A. Main Line A. Pump A. Line Locate B. Valves B. Water Tower B. Line Locate C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: ~ {[bbO- ~0 7. If Meter/Service Leak Classify: City A. Water Loss (estimate): GPM __ B. Was Water Metered: YES C. Was Customer Notified: VERBALLY If Meter Change Out: A. Old Meter # B. New Meter # C. Old Meter Size / Type E. Type of work performed or findings: Fire Plug Flushing NO Customer Total Gallons DOORKNOCKER Reading Reading New Meter Size ! Type 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: 11. List materials used: Crew members: 12. If you had an accident/incident while performing this request, did you report it? 13. Water Utilities meter inspection: PASS or FAIL 14. 'How many trips to do task? YES or NO Signature 9?2 304 Z570 0B/02×2002 10:39 CITY OF COPPELL ENGR. DEPT. ~ BRU CTR NO.90Z DO1 CH]gCK ONE: I~KIC~ATION._.~ ' DOMI~STIC The bacL~ow prevmtion assembly detafl~i below ha~ ~ N-~I~:[ ~md maintained ~ ~qu~-~t by. TN-RCC m~)-~om and is c~ified to be op~ta~ug w~:hm acceptable pamm~rs. Reduced P~ssure Priaciple Doubl~ Chcr. k Valve S~n,~ Nm~b~r ~ Double C'aeck Valve A~s~mbly 1St Check ] 2nd Check ~efVaJve .~r lnJct Check Val~e DC-CIrri Closed Ti.~t ~)~ Opened at Opened ar psid L~..a~l c~ Did not Opm u Le.~ed [] Ma~ais Used Te~ A.ff~ DC-Closed Closed Tight m Opcn~ at Opted at psid Repair Tight t~ . , p$id psid RP__~psid White - Cuatomer~ Copy Yellow - City Copy Pink - Tester's Copy 08/02/2002 10:39 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0,903 CIIRCK ONF.~ IRRIGATION ~ DOMESTIC FIREI.~NE BA~OW PREVENTION ASSEMBLY TEST AND M.4~qTENANCE P~ LD. ~ ba=t~ow pz~'ve~cion assembly def..~e~ below h,~ been ~ and ,,..mtain~t ~s r~quiz~d by '~rRCC and ts T~E OF ASSEMBLY ~duc~l Pr~ure Pr~c~ple Double C~eck Valve Located At Pressure Vacum= Brtal~ Atmosphere Vacuum Br¢~u~ Number REDUCED PRESSURE PRINCfPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check V~ve ~bly ,, 1~=~ ]'2nd =e~"---- ~cf V~ve ~r l.et ~ T~t DC-CI~ -- Clos~ Ti~t ~ ~ at ~ at psid ~ ~-~sidTi~t/~ ~ L~,,,,u- psid p~id ~ ~ ~ / Did not ~ Ma~ T~ ~ DC-Clos~ CI~ TiC m ~ aC ~ at osid ~ Tier ~ asid psid ~ mid P82 White - Customer's Copy Yellow - City Copy Pink - TeztePs Coov