Amberpoint-CS020802 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Larry Davis, Construction Inspector
Danny Hightower, Utilities Maintenance ~)~ / ~p
August 2, 2002
Northpoint Drive Walk-thru, August 1 & 2, 2002
1. All okay for Utilities ONLY.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
08/02/02 12:~?
ID=CITY OF COPPELL
DATE
08×02
S~R-TIME DISTANT STATION ID
00~24'' 9?2 ~04 7041
MODE PAGES RESULT
CALLING 01 OK 0000
From: Rhonda Brothers
To: walkthru group
Date: 7/30/02 12:41 PM
Subject: Northpoint Drive
Per Larry Davis - a final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for Thursday, August 1, 2002 at 8:30 a.m.
Rhonda Brothers
Engineering Dept. Secretary
Issued:
Name:
Phone Number (FLM):
Finished:
WATER
Employee: ~}q[/ Grid Map:
Address: DO
(WK):
Check For: Accuracy Test
Meter Leak
Initial Meter Relocation Inspections
I. Backflow Insp.
Backflow Insp.
Bkfiow Cert. Date
Re-Cert. Date
Check Water Pressure
Re-Read
2. Repair 3. Maintenance 4. Other
A. Main Line A. Pump A. Line Locate
B. Valves B. Water Tower B. Line Locate
C. Service Line C. Samples C. Tap
D. Hydrants D. Equipment D. Excavation
E. Safety
5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other
6, List of Safety Equipment at Site (if applicable):
A. Barricades B. Cones C. Tape D. Lights E. Other
REQUEST FOR SERVICES: ~ {[bbO- ~0
7. If Meter/Service Leak Classify:
City
A. Water Loss (estimate): GPM __
B. Was Water Metered: YES
C. Was Customer Notified: VERBALLY
If Meter Change Out:
A. Old Meter #
B. New Meter #
C. Old Meter Size / Type
E. Type of work performed or findings:
Fire Plug Flushing
NO
Customer
Total Gallons
DOORKNOCKER
Reading
Reading
New Meter Size ! Type
9. If mainline or deep service repair, describe type of pipe or service line and condition:
10. Man hours:
11. List materials used:
Crew members:
12. If you had an accident/incident while performing this request, did you report it?
13. Water Utilities meter inspection: PASS or FAIL
14. 'How many trips to do task?
YES or NO
Signature
9?2 304 Z570
0B/02×2002 10:39 CITY OF COPPELL ENGR. DEPT. ~ BRU CTR NO.90Z DO1
CH]gCK ONE:
I~KIC~ATION._.~ ' DOMI~STIC
The bacL~ow prevmtion assembly detafl~i below ha~ ~ N-~I~:[ ~md maintained ~ ~qu~-~t by. TN-RCC
m~)-~om and is c~ified to be op~ta~ug w~:hm acceptable pamm~rs.
Reduced P~ssure Priaciple
Doubl~ Chcr. k Valve
S~n,~ Nm~b~r ~
Double C'aeck Valve A~s~mbly
1St Check ] 2nd Check ~efVaJve .~r lnJct Check Val~e
DC-CIrri Closed Ti.~t ~)~ Opened at Opened ar psid
L~..a~l c~ Did not Opm u Le.~ed []
Ma~ais
Used
Te~ A.ff~ DC-Closed Closed Tight m Opcn~ at Opted at psid
Repair Tight t~ . , p$id psid
RP__~psid
White - Cuatomer~ Copy Yellow - City Copy Pink - Tester's Copy
08/02/2002 10:39 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR
N0,903
CIIRCK ONF.~
IRRIGATION ~ DOMESTIC
FIREI.~NE
BA~OW PREVENTION ASSEMBLY TEST AND M.4~qTENANCE
P~ LD. ~
ba=t~ow pz~'ve~cion assembly def..~e~ below h,~ been ~ and ,,..mtain~t ~s r~quiz~d by '~rRCC
and ts
T~E OF ASSEMBLY
~duc~l Pr~ure Pr~c~ple
Double C~eck Valve
Located At
Pressure Vacum= Brtal~
Atmosphere Vacuum Br¢~u~
Number
REDUCED PRESSURE PRINCfPLE ASSEMBLY PRESSURE VACUUM BREAKER
Double Check V~ve ~bly
,, 1~=~ ]'2nd =e~"---- ~cf V~ve ~r l.et
~ T~t DC-CI~ -- Clos~ Ti~t ~ ~ at ~ at
psid
~ ~-~sidTi~t/~ ~ L~,,,,u- psid p~id
~ ~ ~ / Did not ~
Ma~
T~ ~ DC-Clos~ CI~ TiC m ~ aC ~ at osid
~ Tier ~ asid psid
~ mid
P82
White - Customer's Copy Yellow - City Copy Pink - TeztePs Coov