Amberpoint-CS030409 T H E · C I "IF y · 0
CO-PPE-LL
April 9, 2003
Jalme Beard, P.E.
Halff Associates
8616 Northwest Plaza Dr
Dallas, TX 75225
RE: Staples (Amberpoint at Coppell)
Final Acceptance
Dear Mr. Beard:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for
the referenced project.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter.
Larry ~,~ i s
Construction nspector
Office Phone: (972) 304-3684
Fa,x: (972) 304-3570
CC:
Ken Griffin, Director of Engineering & Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Kirk Woltman, Hill & Wilkinson
James Gaspard, Transwestern Commercial Services