Loading...
WA9701-CS 970403h q'7 c> l TEAGUE NALL AND PERKINS April 03, 1997 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Blvd. P.O. Box 478 : Mo ' ' f Services Dear Ken: The enclosed Modification to the Scope of Services for the referenced Contract has been prepared, per your request, in accordance with the applicable provisions of the Engineering Services Contract for the Wrangler Drive Reconstruction Project dated August 13, 1996. This modified scope of services adds to the original engineering services contract the design of approximately 4,000 linear feet of 16-inch water line and other related improvements along Belt Line Road and Denton-Tap Road from Airline Drive to Bethel Road. A preliminary opinion of probable construction cost for these additional improvements is also enclosed for your information. The subject Modification of the Scope of Services is based upon the following assumptions: The alignment for the proposed water line improvements will be along the west side of Belt Line Road and Denton Tap Road for the entire length of the project. The City will provide plans for the existing water, sanitary sewer, paving and drainage improvements within and/or adjacent to the project area. Easement documents, if any, will be prepared and provided in accordance with the provisions of Attachment "B'-- Special Services in the original Engineering Services Contract. Should you have any questions regarding the proposed Modifications to the Scope of Services, please give me a call. 915 FLORENCE STREET FORT WORTH, TEXAS 76102 {817) 336-5773 FAX (817) 336-2813 2001 W. IRVING BLVD. IRVING, TEXAS 75061 (972) 254-1765 METRO 1972) 251-1627 FAX (972) 251-4348 Mr. Kenneth M. Griffin, P.E. April 03, 1997 Page Two Sincerely, Teague Nall and Perkins, Inc. Michael A. Jones, P.E. MAJ/czf Enclosures TEAGUE NALL AND PERKINS, INC. ENGINEER'S PRELIMINARY OPINION OF PROBABLE COST City of Coppefl, Texas Project Name: 16-Inch W. L. Improvements - Belt Line/Denton-Tap Road (Airline Drive to Bethel Road) ITEM DESCRIPTION OF ITEM UNIT TOTAL UNIT NO. QUANTITY PRICE Apdl 03, 1997 Proj. No. CPL 96164 COST Proposed W. L. Improvements I 6-Inch Water Line LF 120 20.00 2 8-Inch Water Line LF 150 25.00 3 10-Inch Water LIne LF 50 30.00 4 16-Inch Water LIne LF 4,000 55.00 5 6-Inch Gate Valve Each 6 400.00 6 16-Inch Valve w/3-Inch Bypass EA. 4 6,500.00 7 Fittings LS 1 10,000.00 8 Bore, Casing Pipe & Pressure Grout LF 420 180.00 9 Fire Hydrant Each 6 400.00 10 Air &Vacuum Release Valve Each 1 1,500.00 11 Blow-Off Valve Each I 2.000.00 12 Connect to Existing System Each 5 500.00 13 Connect to Existing 24-Inch W.L Each 2 2,500.00 14 Abandon Existing Water Line LS 1 2,500.00 15 Remove/Replace Concrete Parking SY 150 40.00 16 Protect/Repair Existing Irrigation System LS 1 2,500.00 17 Trench Safety for 16-Inch W.L LF 3,580 2.00 18 Erosion & Sediment Control LS I 1,500.00 19 Block Sodding SY 2,500 3.50 2,400.00 3,750.00 1,500.00 220,000.00 2,400.00 26,000.00 10,000.00 75,600.00 2,400.00 1,500.00 2,000.00 2,500.00 5,000.00 2,500.00 6,000.00 2,500.00 7,160.00 1,500.00 8,750.00 PREPARED BY: SUBTO=TAL CONTINGENCY (10%) TOTAL Page 1 Of 1 $383,460.00 $38,346.00 $421,806.00 CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services I. ADDITIONAL SCOPE OF SERVICES Design 16-inch water line and other related improvements from the existing 12-inch main in Airline drive to the existing 16-inch main in Bethel Road ( Approx. 4000 L.F.) II. PROJECT SCHEDULE The additional design will be completed within 90 days from receipt of written approval/authorization for the Modification to the Scope of Services from the City. III. COMPENSATION The Engineer shall be paid an additional fee for the above described Additional Scope of Services in an amount not to exceed the lump sum of Thirty-Three Thousand Eight Hundred Thirty and no/100 Dollars ($33.830.00). This amount includes $10,000.00 for design surveys and $23,830 for basic engineering services. APPROVED: AGREED/ACCEPTED: THE CITY OF COPPELL By: Date: TEAGUE NALL AND PERKINS,INC. By: Date: Attest: Attest: II. CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services ADDITIONAL SCOPE OF SERVICES Design 16-inch water line and other related improvements from the existing 12-inch main in Airline drive to the existing 16-inch main in Bethel Road ( Approx. 4000 L.F.) PROJECT SCHEDULE The additional design will be completed within 90 days from receipt of written approval/authorization for the Modification to the Scope of Services from the City. IlL COMPENSATION The Engineer shall be paid an additional fee for the above described Additional Scope of Services in an amount not to exceed the lump sum of Thirty-Three Thousand Eight Hundred Thirty and no/100 Dollars ($33.830.00). This amount includes $10,000.00 for design surveys and $23,830 for basic engineering services. APPROVED: THE CITY OF COPPELL By: D ate: AGREED/ACCEPTED: TEAGUE NALL AND PERKINS,INC. By: Attest: Attest: APPROVED: THE CITY OF COPPELL By: CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services I. ADDITIONAL SCOPE OF SERVICES Design 16-inch water line and other related improvements from the existing 12-inch main in Airline drive to the existing 16-inch main in Bethel Road ( Approx. 4000 L.F.) II. PROJECT SCHEDULE The additional design will be completed within 90 days from receipt of written approval/authorization for the Modification to the Scope of Services from the City. IlL COMPENSATION The Engineer shall be paid an additional fec for the above described Additional Scope of Services in an amount not to exceed the lump sum of Thirty-Three Thousand Eight Hundred Thirty and no/100 Dollars ($33.830.00). This amount includes $10,000.00 for design surveys and $23,830 for basic engineering services. AGREED/ACCEPTED: TEAGUE NALL AND PERKINS,INC. By: Date: Date: Attest: Attest: 915 Florence St. 2001 West Irving Blvd. Ft. Worth, Texas 76102 Irving, Texas 75061 (817) 336-5773 (972) 254-1765 TO City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 DAT. April 4, 1997 I ,os.o. CPL 96164 ATTE.T~O. Mr. Ken Griffin, P.E., City Engineer Wrangler Drive Reconstruction WE ARE SENDING YOU [] Shop drawings [] Copy of letter COPIES DATE NO. 3 [] Attached [] Prints [] Plans [] Change order [] [] Under separate cover via [] Samples DESCRIPTION the following items: [] Specifications Copies - Modification to the Scope of Services for the Proposed 16" Water Line in Belt Line Road/Denton Tap Road THESE ARE TRANSMITTED as checked below: [] For your approval [] For your use [] As requested [] For review [] FOR BIDS DUE REMARKS: [] Approved as submitted [] Approved as noted [] Returned for corrections 19 [] Resubmit [] Submit [] Return copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US COPY TO: If enclosures are not as noted, kindly notify us at once. P:\CPL96164\DOCS\CORRES\TRANSMI4.WPD 'T ! I