The enclosed Modification to the Scope of Services for the referenced Contract has been prepared,
per your request, in accordance with the applicable provisions of the Engineering Services
Contract for the Wrangler Drive Reconstruction Project dated August 13, 1996. This modified
scope of services adds to the original engineering services contract the design of approximately
4,000 linear feet of 16-inch water line and other related improvements along Belt Line Road and
Denton-Tap Road from Airline Drive to Bethel Road. A preliminary opinion of probable
construction cost for these additional improvements is also enclosed for your information.
The subject Modification of the Scope of Services is based upon the following assumptions:
The alignment for the proposed water line improvements will be along the west
side of Belt Line Road and Denton Tap Road for the entire length of the project.
The City will provide plans for the existing water, sanitary sewer, paving and
drainage improvements within and/or adjacent to the project area.
Easement documents, if any, will be prepared and provided in accordance with the
provisions of Attachment "B'-- Special Services in the original Engineering
Services Contract.
Should you have any questions regarding the proposed Modifications to the Scope of Services,
please give me a call.
915 FLORENCE STREET
FORT WORTH, TEXAS 76102
{817) 336-5773
FAX (817) 336-2813
2001 W. IRVING BLVD.
IRVING, TEXAS 75061
(972) 254-1765
METRO 1972) 251-1627
FAX (972) 251-4348
Mr. Kenneth M. Griffin, P.E.
April 03, 1997
Page Two
Sincerely,
Teague Nall and Perkins, Inc.
Michael A. Jones, P.E.
MAJ/czf
Enclosures
TEAGUE NALL AND PERKINS, INC.
ENGINEER'S PRELIMINARY OPINION OF PROBABLE COST
City of Coppefl, Texas
Project Name: 16-Inch W. L. Improvements - Belt Line/Denton-Tap Road
(Airline Drive to Bethel Road)
ITEM DESCRIPTION OF ITEM UNIT TOTAL UNIT
NO. QUANTITY PRICE
Apdl 03, 1997
Proj. No. CPL 96164
COST
Proposed W. L. Improvements
I 6-Inch Water Line LF 120 20.00
2 8-Inch Water Line LF 150 25.00
3 10-Inch Water LIne LF 50 30.00
4 16-Inch Water LIne LF 4,000 55.00
5 6-Inch Gate Valve Each 6 400.00
6 16-Inch Valve w/3-Inch Bypass EA. 4 6,500.00
7 Fittings LS 1 10,000.00
8 Bore, Casing Pipe & Pressure Grout LF 420 180.00
9 Fire Hydrant Each 6 400.00
10 Air &Vacuum Release Valve Each 1 1,500.00
11 Blow-Off Valve Each I 2.000.00
12 Connect to Existing System Each 5 500.00
13 Connect to Existing 24-Inch W.L Each 2 2,500.00
14 Abandon Existing Water Line LS 1 2,500.00
15 Remove/Replace Concrete Parking SY 150 40.00
16 Protect/Repair Existing Irrigation System LS 1 2,500.00
17 Trench Safety for 16-Inch W.L LF 3,580 2.00
18 Erosion & Sediment Control LS I 1,500.00
19 Block Sodding SY 2,500 3.50
2,400.00
3,750.00
1,500.00
220,000.00
2,400.00
26,000.00
10,000.00
75,600.00
2,400.00
1,500.00
2,000.00
2,500.00
5,000.00
2,500.00
6,000.00
2,500.00
7,160.00
1,500.00
8,750.00
PREPARED BY:
SUBTO=TAL
CONTINGENCY (10%)
TOTAL
Page 1 Of 1
$383,460.00
$38,346.00
$421,806.00
CITY OF COPPELL
Consulting Engineer's Contract
Modification to the Scope of Services
I. ADDITIONAL SCOPE OF SERVICES
Design 16-inch water line and other related improvements from the existing 12-inch main
in Airline drive to the existing 16-inch main in Bethel Road ( Approx. 4000 L.F.)
II. PROJECT SCHEDULE
The additional design will be completed within 90 days from receipt of written
approval/authorization for the Modification to the Scope of Services from the City.
III. COMPENSATION
The Engineer shall be paid an additional fee for the above described Additional Scope of
Services in an amount not to exceed the lump sum of Thirty-Three Thousand Eight
Hundred Thirty and no/100 Dollars ($33.830.00).
This amount includes $10,000.00 for design surveys and $23,830 for basic engineering
services.
APPROVED:
AGREED/ACCEPTED:
THE CITY OF COPPELL
By:
Date:
TEAGUE NALL AND PERKINS,INC.
By:
Date:
Attest:
Attest:
II.
CITY OF COPPELL
Consulting Engineer's Contract
Modification to the Scope of Services
ADDITIONAL SCOPE OF SERVICES
Design 16-inch water line and other related improvements from the existing 12-inch main
in Airline drive to the existing 16-inch main in Bethel Road ( Approx. 4000 L.F.)
PROJECT SCHEDULE
The additional design will be completed within 90 days from receipt of written
approval/authorization for the Modification to the Scope of Services from the City.
IlL COMPENSATION
The Engineer shall be paid an additional fee for the above described Additional Scope of
Services in an amount not to exceed the lump sum of Thirty-Three Thousand Eight
Hundred Thirty and no/100 Dollars ($33.830.00).
This amount includes $10,000.00 for design surveys and $23,830 for basic engineering
services.
APPROVED:
THE CITY OF COPPELL
By:
D ate:
AGREED/ACCEPTED:
TEAGUE NALL AND PERKINS,INC.
By:
Attest:
Attest:
APPROVED:
THE CITY OF COPPELL
By:
CITY OF COPPELL
Consulting Engineer's Contract
Modification to the Scope of Services
I. ADDITIONAL SCOPE OF SERVICES
Design 16-inch water line and other related improvements from the existing 12-inch main
in Airline drive to the existing 16-inch main in Bethel Road ( Approx. 4000 L.F.)
II. PROJECT SCHEDULE
The additional design will be completed within 90 days from receipt of written
approval/authorization for the Modification to the Scope of Services from the City.
IlL COMPENSATION
The Engineer shall be paid an additional fec for the above described Additional Scope of
Services in an amount not to exceed the lump sum of Thirty-Three Thousand Eight
Hundred Thirty and no/100 Dollars ($33.830.00).
This amount includes $10,000.00 for design surveys and $23,830 for basic engineering
services.
AGREED/ACCEPTED:
TEAGUE NALL AND PERKINS,INC.
By:
Date: Date:
Attest: Attest:
915 Florence St. 2001 West Irving Blvd.
Ft. Worth, Texas 76102 Irving, Texas 75061
(817) 336-5773 (972) 254-1765
TO
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019
DAT. April 4, 1997 I ,os.o. CPL 96164
ATTE.T~O. Mr. Ken Griffin, P.E., City Engineer
Wrangler Drive Reconstruction
WE ARE SENDING YOU
[] Shop drawings
[] Copy of letter
COPIES DATE NO.
3
[] Attached
[] Prints [] Plans
[] Change order []
[] Under separate cover via
[] Samples
DESCRIPTION
the following items:
[] Specifications
Copies - Modification to the Scope of Services for the Proposed 16" Water Line in
Belt Line Road/Denton Tap Road
THESE ARE TRANSMITTED as checked below:
[] For your approval
[] For your use
[] As requested
[] For review
[] FOR BIDS DUE
REMARKS:
[] Approved as submitted
[] Approved as noted
[] Returned for corrections
19
[] Resubmit
[] Submit
[] Return
copies for approval
copies for distribution
corrected prints
[] PRINTS RETURNED AFTER LOAN TO US
COPY TO:
If enclosures are not as noted, kindly notify us at once.
P:\CPL96164\DOCS\CORRES\TRANSMI4.WPD
'T ! I