Loading...
WA0101-CS050926CO?FELL MEMORANDUM TO: FROM: DATE: REF: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Suzan Taylor, CIP Coordinator Tim Oates, Fire Marshal Larry Davis, Construction Inspector., ~,4 ~2 September 26, 2005 WALK-THRU for #WA 01-01 SH 121 Water Line (Coppell Rd to Denton Tap) A final walk-thru for the referenced project has been scheduled for Thursday, September 29ta at 9:00 a.m. The walk-thru group will commence from N Coppell Rd at SH 121 near the Verizon building and proceed northward to the end of project. Please let me know if I can be of further assistance. CC: Doug Showers, Birkhoff, Hendricks & Conway Joe Velasquez, Fox Contractors