WA0101-CS050926CO?FELL
MEMORANDUM
TO:
FROM:
DATE:
REF:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Suzan Taylor, CIP Coordinator
Tim Oates, Fire Marshal
Larry Davis, Construction Inspector., ~,4 ~2
September 26, 2005
WALK-THRU for #WA 01-01 SH 121 Water Line (Coppell Rd to Denton Tap)
A final walk-thru for the referenced project has been scheduled for
Thursday, September 29ta at 9:00 a.m.
The walk-thru group will commence from N Coppell Rd at SH 121 near the Verizon
building and proceed northward to the end of project. Please let me know if I can be of
further assistance.
CC:
Doug Showers, Birkhoff, Hendricks & Conway
Joe Velasquez, Fox Contractors