Asbury Manor-CS040524T H E · C: I T Y O F
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Ken Griffin, Director of Engineering
~ll~ Glenn Hollowell, Asst. Director of Public Works
Brad Reid, Director of Parks/Recreation
John Elias, Parks Operations Manager
Keith Marvin, Civil Engineer
Larry Davis, Construction Inspector ,/-'~v/~//
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date:
RE:
May 24, 2004
Re-Scheduled WALK-THRU for Denton Creek/Asbury Manor Trails
A final walk-thru for sanitary sewer manhole and storm drain structure modification on
the referenced project has been re-scheduled for:
Wednesday, May 26, 2004 at 2:00 p.m. at the Moore Rd. end of project
Please let me know if I can be of further assistance.
cc: Steve Jeske, Jeske Construction fax 972-620-9852
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"