Loading...
Asbury Manor-CS040524T H E · C: I T Y O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Ken Griffin, Director of Engineering ~ll~ Glenn Hollowell, Asst. Director of Public Works Brad Reid, Director of Parks/Recreation John Elias, Parks Operations Manager Keith Marvin, Civil Engineer Larry Davis, Construction Inspector ,/-'~v/~// Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: RE: May 24, 2004 Re-Scheduled WALK-THRU for Denton Creek/Asbury Manor Trails A final walk-thru for sanitary sewer manhole and storm drain structure modification on the referenced project has been re-scheduled for: Wednesday, May 26, 2004 at 2:00 p.m. at the Moore Rd. end of project Please let me know if I can be of further assistance. cc: Steve Jeske, Jeske Construction fax 972-620-9852 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"