Loading...
Asbury Manor-CS 981202COPPELL STREETS DIVISI(H~ DATE: December 2, TO: Larry Davis, FROM: Brent Adams, RE: 1998 Construction Inspector Streets Division Walk-thru A sbury Estates 12/1/98 Listed below are Street Division comments relative to 1. Seal around valve stack. walk thru. 2. On Cromwell new concrete to old concrete on curb. 3. Westminster new concrete to old concrete on old fire lane. 4. Rout and seal random cracks. Westminster drop inlet pour invert in floor (holds water) and clean out. 6. Patch sidewalk in common area on pond side. MESSAGE CONF I RMF~T ,I ON 12,"132 -'93 10:3.1 ID:CITY OF CI]PPELL S,, R~.] I I'IE DISTANT STAffIOH !D HODE pr~GES RESULT C l TY CIF CZIF'F'EL L CALL 114G [~:. CIK 0000