Loading...
ST9302-LR 990630ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 6/30/99 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-42 PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST '~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH ~ NUMBER MOISTURE DRY DENSITY MOISTUBE DRy DENSITY COMPACTION COMMENT" % PCF % pea~: 114 6/30/99 FG-8.0 6 12.5 111.2 13.5 106 96 1-A 115 6/30/99 FG-7.0 6 12.5 111.2 14.5 107 96 I-A 116 6/30/99 FG-6.0 6 12.5 111.2 13.4 108 97 I-A 117 6/30/99 FG-5.0 6 12.5 111.2 13.7 106 96 1-A 118 6/30/99 FG-4.0 6 12.5 111.2 13.4 109 98 1-A 119 6/30/99 FG-3.0 6 12.5 111.2 12.7 106 95 1-A 120 6/30/99 FG-2.0 6 12.5 111.2 15.0 106 95 1-A TEST LOCATION: 114 30" WATER LINE AT STATION //53 +45 115 30" WATER LINE AT STATION //53 +40 116 30" WATER LINE AT STATION #53 + 35 117 30" WATER LINE AT STATION //53 +30 118 30" WATER LINE AT STATION //53 + 25 119 30" WATER LINE AT STATION //53 +20 120 30" WATER LINE AT STATION //53 + 15 ~ 1 TILL 2 NATURAL SUSGRADE 3. LIME STABILIZED 4. CEMENI IREAIED A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCEN1 COMPACTION DOES NOI COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETES! Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL COPPELL, TEXAS DATE 6/30/99 PROJECT SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO. 98881-43 TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH ~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 121 6/30/99 FG-6.0 5 13.5 111.9 16.5 109 97 1-A 122 6/30/99 FG-5.0 7 21.§ 99.6 23.0 98 98 1-A 123 6/30/99 FG-4.0 3 13.3 117.6 17.1 116 98 1-A 124 6/30/99 FG-3.0 3 13.3 117.6 17.3 11 § 97 1-A 125 6/30/99 FG-2.0 7 21 .§ 99.6 22.0 96 97 1-A 126 6/30/99 FG-1.0 § 13.5 111.9 16.0 107 96 1-A TEST LOCATION: 121 30" WATER LINE AT STATION #53+90 122 30" WATER LINE AT STATION #53+85 123 30" WATER LINE AT STATION #§3+80 124 30" WATER LINE AT STATION #53 +75 125 30" WATER LINE AT STATION #53+70 126 30" WATER LINE AT STATION #53 +65 1. FILL 2. NATURAL SUBGRADE ~ A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS S. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED O. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting T1 rr