Asbury Manor-CS 971006The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Fred phillips
Ryland Homes
12000 Ford Road, Suite 320
Dallas, TX 75234
October 6, 1997
Asbury Manor
Development Fee Assessment
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make paymem to the City of Coppell in the mount of $142,090.00 and forward to the
Finance Depaxtment along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, t~
Keruneth M. Grif m, P.E.
Assistant City Manager/City Engineer
CC;
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENTFEETABLE
Project: AsburyManor
Date: 10/6/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $22,950.00 $22,950.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $2,350.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,110.44
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $144.38
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,380.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $20,700.00 $20,700.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,300.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,300.00
(100% due at Issuance of Building Permi0
Park Fee $59,110.00 $59,110.00
(100 % due prior to Council Approval)
Roadway Impact Fee $39,330.00 $39,330.00
(100 % due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $151,709.82
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $142,090.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Asbury Manor
DATE: 10/6/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
46 - 5/8 inch X 3/4 inch
46
I - 1 1/2inch 5
Fireline Meter(s):
Total #: 51 ESU's @ $450.00 ea.
{100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 47 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 46 Domestic Meter(s) @ $24.14
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$144.38
Water Meter Deposit Fee (Domestic):
Total #: 46 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
46
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 46 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 46 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$22,950.00
$2,350.00
$1,110.44
$144.38
$0.00
$0.00
$1,380.00
$35.00
$20,700.00
$2,300.00
$2,300.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdentiai Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75,00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
46
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$59,110.00
N/A
$39,330.00
~rmation mt
availableatthistime
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development conu'acts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Asbury Manor
DATE: 10/6/97
ROADWAY IMPACT FEE:
Service Area *
Residential
Cate[~or~ **
Land Use **
Building Size (Sq. Ft.)
Development Units **
Vehicle Miles l~er Development Unit **
Fee l~er Vehicle Mile ***
Single-Family Detached
N/A
46
2.85
$300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles ~er Development Uhi0 x (Fee ~oer Vehicle Mile) = $39,330.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)