Loading...
Asbury Manor-PT 980910Bore/Excavation in Public Right-Of-Way Permit City of C0ppe!l - Public Works Department Date: ~ / I0 /~ Project Name: Permit Issued To: Name: ~ ~nergency Phone: ~e of Work/General Description: ~3f~Lt Have ,~i City and/or F~anchi3e Utilities Been Contacted and Emisting Utili:ies Loca:ed: YES Will It Be Necessa_~y to Excavate Street, Alley or Sidewalk Pavement? YES (attach porT, it) NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and BarricadinG according to the Texas Mnnual on Uniform Traffic Control Devices. ~rea(s) affected must be restored to as good condition as before the commencement of work. kny excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Departments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERMIT Attach Rarricading/~etour Plan if a lane or street closure is applicable. Franchise/Contractor Repres~ Date Franchise Inspector/or City Inspector Ao~r-~vec/Cit-z R~p~e~e~ativ~- Date Applicant shall indemnify and forever hold harmless against each and eve~y claim, demand or cause of action that may be made or come against it by reason of or if any way arising ou~ of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. P E r~MI T. PHB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NO W~ET BORES ALLOWED!