Loading...
Asbury Manor-PT 980909Bore/Excavation in Public Right-Of-Way Permit City of Coppe!l Date: ~ / ~ /~ Permit Issued To: N~ane: Address: - Public Works Department Project Name: C¢~11; /'//~ ,~/'h~C 5~hTi.f Phone: ~ergency Phone: . ! ~ ns tor: Phone: ~"~pe of Work/General Description: ~/9 C~ Location of Work: /~' ~ ~ ~ ~'~ r'~ Have ~1 City and/or Franchise Utilities Been Contacted and Ezistinq Utilities Located: YES 1~ will It Be Necess~ to Excavate Street, ~ley or Si~ Payment? YES (attach pe~it) NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. ~rea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depa_r~_ments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PEP~IT Attach ~arricading/Detour Plan if a lane or street closure is applicable. ._anch_se Inspector/or City Inspector Da~e Date Applicant shall indemnify and forever hold harmless against each and eve~/ claim, demand or cause of action that may be made or come agains~ it by reason of or if any way arising out of the closure, blocking, excavating, cutting, ~unneling, or other work by the applicann under pe-~m, it from the City, if such permit is granted. P ER~HIT. PHB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NO WET BORES ALLOWED!