Ash Addition-CS000714T H IE C: I T Y · 0 F
July 14, 200![}
Earl Cotton
C-Con Services, Inc.
11127 Shady Trail, Suite 108
Dallas, Texas 75229
RE: Ash Addition
Final Acceptance
Dear Mr. Cotton:
A final inspection of the sewer line extension for the referenced project has been conf'n'med by
representatives of the City of Coppell.
The two-year maimenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
CC:
Mike Martin, Assistant City Engineer
Debi Ingrain, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal