Loading...
Ash Addition-CS000714T H IE C: I T Y · 0 F July 14, 200![} Earl Cotton C-Con Services, Inc. 11127 Shady Trail, Suite 108 Dallas, Texas 75229 RE: Ash Addition Final Acceptance Dear Mr. Cotton: A final inspection of the sewer line extension for the referenced project has been conf'n'med by representatives of the City of Coppell. The two-year maimenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. CC: Mike Martin, Assistant City Engineer Debi Ingrain, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal