Date:
DEVELOPMENT FEE TABLE
Assured Self Storage Addition, Lotl, BIockI - REV
TOTAL AMOUNT DUE
FERS DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,400.00
(100% due at Issuance of Buildin~ Permit)
Water Tap Inspection Fee $ 100.00
(I 00% .d..u.e...at Issuance of Water Meter}
Water Meter Fee (Domestic) .... $62.25
(I 00% due at ls,~t,~anee of Water Meter)
Water Meter Fee (Inigation/Fireline) "' $2,~)92.44
.000% due at issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
( 100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Depose $30 00
(100% due at Issuan~ of Water Meier)
Wastewater Impact Fee
(100% due at Issuance of Building Permit)
Wastewaler Tep Inspection Fee $0.00
(100% clue at Issuance of B...u.!.!ding Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Ruiiding Permit)
Park Fee $0.00 $0~00
(100% due prior to Council Approval)
Roadway Impact Fee $2,643 68 $2,643.68
'(100% due prior to Council Approval.)
Street Light F~ Infarmation not Available
(100% duc prior to Acceptance of Pro)eot)
;Strcct Sign Fee Information not Available
(100% due prior to Acceptance of ProJect)
Consiruction Inspection Fee Information not Available
.(100% due liner to S~tr~. of Con?t?ction) . .~.
TOTAL $6,40g.37
TOTAL AMOUNT.DUE PRIOR "fO COUNCIL APPROVAL $2,643.68
04/01/~03 16:41 CITY DF COPPELL ENGR, DEPT, ~ SRU CTR N0.393 Q03
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
,~$~ured $¢l/$1arogc ,4dd#ion, LOI[, BlOCk l - REV
3/$1/05
Waler Impact Fe~:
Domes'tic Meter(e):
Irrigation Meter(s):
Fireline Meter(s):
1 * 1 inch = 2.5 ESU's
0 = 0 [SU's
0 - O ESU's
I . 8 inch = 2.5 ESU's
Total ~: ~ £SU's @ $28000 ea
(Due prior to iseuance of buildin§ permit)
Water Tap llJsp~c§op Fee:
To~al ~: 2 C~necfio~s ~ $50.00 ea
(Smgte family due OHor ~o issuance of OuilOin~ permit)
{All other ~evelopme~t~ due prior to issuance of meter)
Domestic Water Meter Fee:
Totei ~:
Domestic Meter(s) ~ $62.25
(Sm§la family clue prior to issuance of builc~ing permit)
(All ntt~er developments due prior to ~ssuarlce of meter)
[rrJgofion/FirelJne Water Meter Fee:
Total *~: 0 Jrrigatios~ Meter(s) ~ $0.00
Total #: 0 Additional Irrigation Meter(s) ~ $0.00
Total #: ! Fireline Meter(s) ~ .~2,092 44
(]O0~ due prior m ~ssuance of water meters)
Domestic Water Meter Depo~l Fee:
Total ~: ! Meter(a) ~ $30.00 ea.
(100% due prior to issuance of water meters)
Irr[~otioo/Fire Meter Depoeit Fee:
Tatar #: .._i__l Meter(e) ~ $30.00 ea
[3.00% due prior to issuance of water meter~)
Wastcwater Impact Fce~
Total Domestic Meters [SU's: 0
(Duc prior to issuance of building permit)
Wastewaler Tap Inspection Fee:
Total ~: O Connections ~ $50,00 ca.
(300~ due prior to issuance at build~n~
OfiliW Final ]aspecflen Fee (~ deve)epmeMs);
Total ~; ~ Lots ~ $50.00
(~0~ due pri~g te issuance of b~ilding permit)
~ S280 O0 aa,
$3.,40000
$100,00
$62 25
)o.oo
$000
$2.092 4.4
$30.00
$30.00
SO O0
$0.00
$50,00
Pork Fee (For Residential Developments OMy):
· Prelhninary plat approved: After
0 Single.family ~ $0.00 per lot
0 Multi.family ~ $0.00 par unit
(50% paid prior to Council approval of final plat)
$0,00
$0.00
P~e 1
04701×20E13 16:41 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.393 Q04
DEVELOPMENT FEE WORKSHEET
(50% paic~ ~t issuance of buiidin§ permit)
Roadway Impact
[$e~ attached fee calculations)
Slreez LJ~brillg Fees:
Asse~ed for lishtin§ in the City's right-of-way,
This fee cannot be assesseci unN alter T.U, Electric submits
the lighting p~an for the p~o~sed development.
Once the p~ans are submitted, $292.60 per I~ght w~ll De asseseeo.
(]00% ~ue prior to final acceptance ol ~evelopme~t)
$2.64368
~nformation not Available
Street Sign Fees:
Assessed for signege *n the C~ity's right,of.way.
(See attached fee calculations if applicat~le)
Information not Available
Construcffou Inspection Fee~:
A copy ot the development contract must be submitted for assessment.
The contracts s~ould indicate the cost to Construct thc improvements
that are insoected by the Engineering Oepartment.
(2% of development cost recruited for DHvate improvements)
(4% ot development cost recl~ired for puOlic improvemer~ts)
rnformation not Available
Page 2