Loading...
Assured Self-CS03040104×01×2:~ 16:41 CITY OF COPPELL ENGR. DEPT. · SRU CTR COPPELL P.C). Ek~ 478 ENGINEERI'NG DEPARTMENT FAX COVER SHEET mmne~ pq~: /7/- (Indud~ corm'sheet) Urgent ~For Review n Iqelse ~,onlment F1 PhB~sI Reply [] Al I~que~tld IF YOU DO NOT RECF. IYE ALL OF I'HE PA~?£$ PLF~,.~E CALL 04×01xL~3 16:41 CITY OF COPPELL ENGR. DEPT. a SRU CTR N0.393 Q02 Date: DEVELOPMENT FEE TABLE Assured Self Storage Addition, Lotl, BIockI - REV TOTAL AMOUNT DUE FERS DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $1,400.00 (100% due at Issuance of Buildin~ Permit) Water Tap Inspection Fee $ 100.00 (I 00% .d..u.e...at Issuance of Water Meter} Water Meter Fee (Domestic) .... $62.25 (I 00% due at ls,~t,~anee of Water Meter) Water Meter Fee (Inigation/Fireline) "' $2,~)92.44 .000% due at issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 ( 100% due at Issuance of Water Meter) Irrigation/Fireline Meter Depose $30 00 (100% due at Issuan~ of Water Meier) Wastewater Impact Fee (100% due at Issuance of Building Permit) Wastewaler Tep Inspection Fee $0.00 (100% clue at Issuance of B...u.!.!ding Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Ruiiding Permit) Park Fee $0.00 $0~00 (100% due prior to Council Approval) Roadway Impact Fee $2,643 68 $2,643.68 '(100% due prior to Council Approval.) Street Light F~ Infarmation not Available (100% duc prior to Acceptance of Pro)eot) ;Strcct Sign Fee Information not Available (100% due prior to Acceptance of ProJect) Consiruction Inspection Fee Information not Available .(100% due liner to S~tr~. of Con?t?ction) . .~. TOTAL $6,40g.37 TOTAL AMOUNT.DUE PRIOR "fO COUNCIL APPROVAL $2,643.68 04/01/~03 16:41 CITY DF COPPELL ENGR, DEPT, ~ SRU CTR N0.393 Q03 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: ,~$~ured $¢l/$1arogc ,4dd#ion, LOI[, BlOCk l - REV 3/$1/05 Waler Impact Fe~: Domes'tic Meter(e): Irrigation Meter(s): Fireline Meter(s): 1 * 1 inch = 2.5 ESU's 0 = 0 [SU's 0 - O ESU's I . 8 inch = 2.5 ESU's Total ~: ~ £SU's @ $28000 ea (Due prior to iseuance of buildin§ permit) Water Tap llJsp~c§op Fee: To~al ~: 2 C~necfio~s ~ $50.00 ea (Smgte family due OHor ~o issuance of OuilOin~ permit) {All other ~evelopme~t~ due prior to issuance of meter) Domestic Water Meter Fee: Totei ~: Domestic Meter(s) ~ $62.25 (Sm§la family clue prior to issuance of builc~ing permit) (All ntt~er developments due prior to ~ssuarlce of meter) [rrJgofion/FirelJne Water Meter Fee: Total *~: 0 Jrrigatios~ Meter(s) ~ $0.00 Total #: 0 Additional Irrigation Meter(s) ~ $0.00 Total #: ! Fireline Meter(s) ~ .~2,092 44 (]O0~ due prior m ~ssuance of water meters) Domestic Water Meter Depo~l Fee: Total ~: ! Meter(a) ~ $30.00 ea. (100% due prior to issuance of water meters) Irr[~otioo/Fire Meter Depoeit Fee: Tatar #: .._i__l Meter(e) ~ $30.00 ea [3.00% due prior to issuance of water meter~) Wastcwater Impact Fce~ Total Domestic Meters [SU's: 0 (Duc prior to issuance of building permit) Wastewaler Tap Inspection Fee: Total ~: O Connections ~ $50,00 ca. (300~ due prior to issuance at build~n~ OfiliW Final ]aspecflen Fee (~ deve)epmeMs); Total ~; ~ Lots ~ $50.00 (~0~ due pri~g te issuance of b~ilding permit) ~ S280 O0 aa, $3.,40000 $100,00 $62 25 )o.oo $000 $2.092 4.4 $30.00 $30.00 SO O0 $0.00 $50,00 Pork Fee (For Residential Developments OMy): · Prelhninary plat approved: After 0 Single.family ~ $0.00 per lot 0 Multi.family ~ $0.00 par unit (50% paid prior to Council approval of final plat) $0,00 $0.00 P~e 1 04701×20E13 16:41 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.393 Q04 DEVELOPMENT FEE WORKSHEET (50% paic~ ~t issuance of buiidin§ permit) Roadway Impact [$e~ attached fee calculations) Slreez LJ~brillg Fees: Asse~ed for lishtin§ in the City's right-of-way, This fee cannot be assesseci unN alter T.U, Electric submits the lighting p~an for the p~o~sed development. Once the p~ans are submitted, $292.60 per I~ght w~ll De asseseeo. (]00% ~ue prior to final acceptance ol ~evelopme~t) $2.64368 ~nformation not Available Street Sign Fees: Assessed for signege *n the C~ity's right,of.way. (See attached fee calculations if applicat~le) Information not Available Construcffou Inspection Fee~: A copy ot the development contract must be submitted for assessment. The contracts s~ould indicate the cost to Construct thc improvements that are insoected by the Engineering Oepartment. (2% of development cost recruited for DHvate improvements) (4% ot development cost recl~ired for puOlic improvemer~ts) rnformation not Available Page 2