Loading...
Austin Place-CS 970403 TANDARD ACItFIC HOMES FAX 'I'ilANSI~llq['TAL ~IIEET / COIlPANY:__ NUI}ilIER OF PAGES SENT~(l~tchBdizlg tran:~lldttl,! shc~t) you do laot r,_~ei,'e ali oi llle palle-q or ii they lire ilol[ legible. O£ficc - t2 i -1) 550-0~126 F~x - (21-1) 550-71191 NOTES:_ Thank $525 MacArthur IlouleW.~rd ' Suite 580 ' I~ng, T~ 7503g ' (214) 55~426 ' (214) 550-7991 (1:~ IO'a tOO'ON 85:6 Z6,~O Jdu ~68Z-Ogg-7~g:T3~ S3NOH 313IDUd ~U~NUZS Utility Final Inspection Fee 35 lots ~ ~O.O0/lot = $1,750.00 100% due prior issuance of building permit. Water HeterFee (~ots) 35 - %" x %" Residential Meters ~ $22.25 ea 100% due prior to issuance of building permit. $778.75 Water MeterFe~Irrigation) Total 100% due prior to issuance of water meters. ~_~ Irrigation Meter ~ ~ea = $62.10 Water Met~rDeposit Residential - 35 meters ~ $30.00 ea = $1,050.00 100% due prior to issuance of building permit. Irrigation HeterDe~osit /_~ - %" meters ~ S35.00 ea = ~35.00 1 - 1" meters ~ $35.00 e~ = $35.00 Total = S70.0~ 100% due prior to issuance of water meters. street Lighting Fee shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. ~O'd [O0'ON 8S:6 Z6,£0 Jdu I68Z-OS~-~I~:731 $3NOH DIJIDUd 6~U~NUIS COPPELL PUBLXC WORldS ~EMORANDUM DATE TO: FROM: RE: July 22, 1993 Doug Stevens, Engineering Technlcian~ Steven G. Goram, Diector of P~blic W~r~ ) Development Fees for Austin Pla~e The following fees should be assessed on the above project. referenced water Impact Fee: 1 Domestic Meter/s = 35 ESU's Irrigation Meter/s = 100% Wastewater Impact 35 - ~" x %" Total 35 100% due prior to Council approval ~I---ESU's ,1" Fireline Meter/s ~ 2.5 ESU's otal 58.5 su,s S65o.oo ea prior tO Council approval of final plat. ~~ ~~ Residential meters = 35 ESU's ESU's ~ $450.00 ea = S15.750.00 of the final plat. water Tap Inspection Fee 37 connections ~ $100.00 each ~ $ 3,700.00 100% due prior to issuance of building permit. (or in the irrigation meter-prior to issuance of meter). the case of Sewer Tap Inspection Fee 35 Connections ~ $100.00 each 100% due prior to issuance of building permit. £O'd [O0'ON 6S:6 Z6,£0 Jdu I68Z-OSS-~Ig:qSi SRNOH DIJlDUa G~UflNUIS Received From Address__ {)34001 ~O'd IO0'ON 6S:6 Z6,£0 Jdu ~68Z-OGG-~:qaL SSNOH DIJIDUa GHUQNUIS STANDARD PACIFIC HOMES ,EL:21d-S50-?891 Ape 05'97 10:00 No.O01 P.05