Austin Place-CS 970403 TANDARD ACItFIC
HOMES
FAX 'I'ilANSI~llq['TAL ~IIEET
/
COIlPANY:__
NUI}ilIER OF PAGES SENT~(l~tchBdizlg tran:~lldttl,! shc~t)
you do laot r,_~ei,'e ali oi llle palle-q or ii they lire ilol[ legible.
O£ficc - t2 i -1) 550-0~126
F~x - (21-1) 550-71191
NOTES:_
Thank
$525 MacArthur IlouleW.~rd ' Suite 580 ' I~ng, T~ 7503g ' (214) 55~426 ' (214) 550-7991 (1:~
IO'a tOO'ON 85:6 Z6,~O Jdu ~68Z-Ogg-7~g:T3~ S3NOH 313IDUd ~U~NUZS
Utility Final Inspection Fee
35 lots ~ ~O.O0/lot = $1,750.00
100% due prior issuance of building permit.
Water HeterFee (~ots)
35 - %" x %" Residential Meters ~ $22.25 ea
100% due prior to issuance of building permit.
$778.75
Water MeterFe~Irrigation)
Total
100% due prior to issuance of water meters.
~_~ Irrigation Meter ~ ~ea = $62.10
Water Met~rDeposit
Residential - 35 meters ~ $30.00 ea = $1,050.00
100% due prior to issuance of building permit.
Irrigation HeterDe~osit
/_~ - %" meters ~ S35.00 ea = ~35.00
1 - 1" meters ~ $35.00 e~ = $35.00
Total = S70.0~
100% due prior to issuance of water meters.
street Lighting Fee
shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
~O'd [O0'ON 8S:6 Z6,£0 Jdu I68Z-OS~-~I~:731 $3NOH DIJIDUd 6~U~NUIS
COPPELL PUBLXC WORldS
~EMORANDUM
DATE
TO:
FROM:
RE:
July 22, 1993
Doug Stevens, Engineering Technlcian~
Steven G. Goram, Diector of P~blic W~r~ )
Development Fees for Austin Pla~e
The following fees should be assessed on the above
project.
referenced
water Impact Fee:
1
Domestic Meter/s = 35 ESU's
Irrigation Meter/s =
100%
Wastewater Impact
35 - ~" x %"
Total 35
100% due prior to Council approval
~I---ESU's
,1" Fireline Meter/s ~ 2.5 ESU's
otal 58.5 su,s S65o.oo ea
prior tO Council approval of final plat. ~~ ~~
Residential meters = 35 ESU's
ESU's ~ $450.00 ea = S15.750.00
of the final plat.
water Tap Inspection Fee
37 connections ~ $100.00 each ~ $ 3,700.00
100% due prior to issuance of building permit. (or in
the irrigation meter-prior to issuance of meter).
the case of
Sewer Tap Inspection Fee
35 Connections ~ $100.00 each
100% due prior to issuance of building permit.
£O'd [O0'ON 6S:6 Z6,£0 Jdu I68Z-OSS-~Ig:qSi SRNOH DIJlDUa G~UflNUIS
Received From
Address__
{)34001
~O'd IO0'ON 6S:6 Z6,£0 Jdu ~68Z-OGG-~:qaL SSNOH DIJIDUa GHUQNUIS
STANDARD PACIFIC HOMES ,EL:21d-S50-?891 Ape 05'97 10:00 No.O01 P.05