Austin Place-CS 930726The City Wit~autiful Future July 26, 1993 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Bill Anderson Dowdey Anderson & Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 RE: Austin Place Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for Austin Place. Please provide a check made payable to the City of Coppell in the amount of $47,519.85 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Michael A Martin E.I.T. cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: July 26, 1993 Project: Austin Place TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100%due at Issuance of Building Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100%due at Issuance of Building Permit) Utility Final Inspection Fee (100%due at Issuance of Building Permit) Water Meter Fee (Lots) (100%due at Issuance of Building Permit) Water Meter Fee (Irrigation) (100%due at Issuance of Water Meters) Water Meter Deposit (100%due at Issuance of Building Permi0 Irrigation Meter Deposit (100%due at Issuance of Water Meters) Street Sign Fee (100%due prior to Acceptance of Project) Street Light Fee (100%due prior to Acceptance of Project) Park Fee (50% due prior to Council Approval) (50%due prior to Issuance of Building Permi0 $ 25,025.00 $ 25,025.00 $ 3,700.00 -0- $ 15,750.00 $ 15,750.00 $ 3,500.00 -0- $ 1,750.00 -0- $ 778.75 -0- $ 84.35 -0- $1,050.00 -0- $ 70.00 -0- $ 619.85 $619.85 * -0- $ 12,250.00 $ 6,125.00 TOTAL $ 64.577.95 $ 47,519.85 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 47,519.85 + Construction Inspection Fee (2% of Project Cost due prior to preconstrucfion meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: July 22, 1993 . 1'""~%. Doug Stevens, Englneering Technician~ Steven G. Goram, Diector of Public W~ ) Development Fees for Austin Place The following fees should be assessed on the above project. referenced Water Impact Fee: 35 - %" x ~" Domestic Meter/s = 35 ESU's 1 - %" x ~" Irrigation Meter/s = 1 ESU's 1 - 1- Fireline Meter/s = 2.5 ESU's Total 38.5 BSU's ~ $650.00 ea = $25,025.00 100% due prior to Council approval of final plat. Wastewater Impact 35 %" x ~" Total 35 100% due prior to Council approval of the final Residential meters = 35 ESU's ESU's @ $450.00 ea = $15.750.00 plat. Water Tap Inspection Fee 37 Connections @ $100.00 each = $ 3,700.00 100% due prior to issuance of building permit. (or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 35 Connections @ $100.00 each = $3,500.00 100% due prior to issuance of building permit. utility Final Inspection Fee 35 lots @ $50.00/lot = $1,750.00 100% due prior issuance of building permit. Water Meter Fee (Lots) 35 - %" x %" Residential Meters @ $22.25 ea 100% due prior to issuance of building permit. = $778.75 (Irrigation) 1 - Irrigation Meters ~ 1 - Irrigation Meter @ $62.10 Total 100% due prior to issuance of water meters. Water Meter Fee %" x ~" $22.25 ea = $22.25 ea = $62.10 = $ 4.35 Water Meter Deposit Residential - 35 meters ~ $30.00 ea = S1.050.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 1 - %" meters @ $35.00 ea = $35.00 1 - 1" meters @ $35.00 ea = $35.00 Total = $70.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots ~ $150.00 ea = $ Units (Multi-family) @ $75.00 ea = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined; 35 Residential Lots ~ $350.00 ea = $12,250.00 Units (Multi-family) at $350.00 ea = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise If you have advise. HLP/dm cc: the Developer of these fees and due dates. any questions regarding these assessments please Steven G. Goram Director of Public Works FEES.AUSTIN.HLP Development Fees Page 4 for Austin Place STREET SIGN ASSESSMENT The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit 63.54 5 $317.70 Yield 58.56 Stop 65.12 Street Name 11.60 Stop & Street Combo 96.85 3 290.55 OTHER No Outlet 11.60 1 11.60 TOTAL $619.85 Cost breakdowns may be obtained from Public Works by written request. HLP/dm CC: Steven G. Goram Director of Public Works FEES/AUSTIN.HLP DEVELOPMENT FEES SENT 7/26/93 7/26/93 7/26/93 7/26/93 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Const. inspection(Grading) Irrigation Street Escrow Street Cut Permit Overtime Inspection ASSESSED FEE $6,125.00 $25,025.00 $15,750.00 $619.85 $412.20 AMOUNT PAID DATE $412.30 4/26/96 TOTALS Total Fees $47,932.05 Fees Paid Amount Owed $412.30 $47,519.75 NOTES 4/26/96 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved