Loading...
Austin Place-WO 970506Phone: (hm). -- (wk) yT~ 07~ 7 "lype of m~t~rial A. Concrete* 2. Na(lfi'e of B. Asphalt A. Holding water C. Gravel B. Pot hole D. Dirt C. Mud hole *Street Repair__ D.Previous site has s~ttled ~ E. Rolling street ~ G. Other , Alley Repair , Sidewalk Repair Sq. Ft. Priority i 2 or 3 Who caused the problem or who is responsible for the problem A. The city E. Another utility company B. The customer F. Sate of Texas C. The contractor G. Other D. The developer How were the repairs made: A. Cut out and blocked yes no B. If concrete - was it doweled and pinned with steel, yes no C. If asphalt - was site cleaned out 2 inch yes no D. If asphalt - was site dry, yes no E. If asphalt - was site cleaned from dust or lose particles yes no F. If asphalt - was TAC added to all joints, yes no G. If asphalt - was seal coat applied? yes no H. If site is asphalt or base, was it compacted with a yes no "Wacker Packer" or Jumping Jack? L Was a roller used yes no Note why did this problem occur A. Settling of site B. Poor construction C. Shoulder rolling off D. Turning radius E. Other Were ba-mcades used yes or no Were barricades removed yes or no Barricades for Other Departments Were the customers informed yes or no Was door knocker left yes or no Weather conditions A. Dry D. Cold B. Wet E. Other C. Hot Does the ditch need cleaned out: yes Does the culvert need to be cleaned or replaced: yes Do the brick pavers need to be replaced: yes Was there an accident/incident: yes How many trips to do task? or no or no or no or no Signature Did you rej~on: yes or no