Loading...
BEI Properties-CS05020402/10/2E~5 14:20 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.023 ~¢ith M. Hamilton, Hamiltom Consulting 601 Haloed Road Hur~t, TX 76054 RE: BEI Properties Addition, Lot I, Block A Fee Assessmenl Letter Dear Mr. Hamilton: COl'FELL February,, 4, 2005 E~nclosed is a copy of the City of Coppell Development Fee ^ssessmen! table, along with a copy o~' thc Development Fcc calculations rot thc l:fcrcnced development. Please mage paymm~, for the Impact lees to the City of Coppell in the amount of ~5,050.84 and forward to thc Engine'enng Depa~me~t along with a copy of she Fee Asseument table. This amoant is a po~ion of the asseSsed fees that need to be paid pr~or to filing of the final pla. Please note that the Texas Legislature, und~ Senate Bill 243, delayed thc collection of Wac, er and Sewer Impact Fees until the issuance ufa Building pennis. Please provide a copy orthc £ngmeer's estimale or contract to our office so the 2% & 4% construction inspection ['ee oan be v~ified. The construction insp~lion fees must be paid prior Io the scheduled pre-construction meeting. Thc additional fees for water and acwcr taps, water mctcr~, and utility inspection fees need :o be paid by separate check at the new Public Works Service Cenl~r, 816 S. Coppell Read. Meters will be ordered when those fees are paid. Appropriate payment of the required Fees will help insure a successful bcgim~ing of this pro~ect. We look forward to workil~g with you on thi~ project. I1' yurt have any questions, please ~ontact me. gincerel~, Ch~rt~ne 1~ Ma~in~, E.I.T. Graduate Engineer J~nnif~r Atrn,qrong, Finance Director Maa'y Beth gpletzer, Administrative Secretary, Building Inspection~ Glenn Hollow¢ll, Assistant Director of Public Works Grog Jones, Chief Building Ogicial Brad Reid, Director of Pa~ks and Recreation 02/10×i~D~5 14:20 CITY OF CDPPELL ENGR. DEPT. ~ SRU CTR N0.823 DEVELOPMENT FEE TABLE Project: liEI Pro~ente~ ,4dditia~, Lot 1, Block A ' TOTAL AMOUNT DuE FEES DUE P~tlOR TO COUNCIL APPROVAL Water Impel Fee $1,4~.00 (1 ~A due at !~,mnee of B~ldm$ P~il) Waler T~ Im~on F~ $1 ~.00 {1~% du~ at l~ae Wat~ M~r F~ (Dome~ac) (I ~% du~ ~ ls*umce of Water M~} , (100% due al ~u~ce of Wat~ Water Mcta~ D~I ~o~0tic) (1 ~/o duc ~ ~u~ of W~cr M~) ~6ig~io~i~lin~ M~ D~osit W~tewal~ I~ac~ ~ (100% ~ a~ l~n~ of Build&8 (1 ~% duc at lsso~ncc of Building U61i~ Fi~ Inaction F~ (1~% d~e at l/~]an~e ofBmldin~ P~I) ,, P~k F~ S0.~ S0.~ (i~ due ~or ~ Cou~ (1~% duc prior to Council S~t Light F~ a fox,on not Av~lable Sff~ Si~ F~ nfo~afi~ ~t A~I~I~ (1~/. due ~ot to A~qt~ of Pmim) C~s~tion l~tion Fee Info~ation not Av~lable (i~% duc pfi~ Io S~ of~nslmaion) . ~ ~ $7,531.88 TOT~ TOTAL ~O~ ~U~ ~OR ~ ~I~G ~NAL PLAT S ~,0S0.S4 02/10/2I~5 14:20 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.823 DEVELOPMENT FEE WORKSHEET PROJECT: B£I Prepe~igs ,4dditiea, Lot I, Jleck ,~ DATE: 2/7/2005 Wa~er lmpac~ Fee: oomestic Imgetian Findine UeMr{s): 1 - 1 Inch = 2.5 ! - 1 Inch : '2,5 ESU's 0 "= D ESU's 0 = 0 ESU'$ Total #: 5 ESU's [Due prior to iemJanco aP oulldtng permit) Water Tap Inspection Fee: Tom ~: 2 CoflfleclJofls ~amil¥ due prior to ~oouence of ~ildJflGI iMrmlt) (All olher devetel~maflts due pri~ to issumco of meter) Domestic Water Meter Fee: Tafal #: I DomesUc Meter(s) O $60.52 ~amlly clue prior to Issuance of building pmmit] (All olher d®velOpmerltl due pdor to )s:~uaflce of meter) IrrJrtion/gireUfle Water MeUr Fee: TotaJ ~. 1 trr~aeon Meter(u) · Total ~.. 0 Add#tonal Irfloatlm~ Mole~[6) I~ SO.O0 TOlal lit:.0 Flrolina Mel8~$) 0 $0,~0 (100% ~tae prior to IssuanCe of wane; meters) Dam. tlc Water Meter Depe$it Fee: Total #: 1 MolaRs) O $30.00 (100% due prior lo Issuance o~wa er metem) lrrigzlion/Fire Meter Deposit Fee: Totel #: 1 Metor~o) ~ $30r~ ea. (100% duo pdor to LAsuaflce of water meters) Wstltewater Impact Ff~: Total DemeMi~ Metem EgU'o: 2.5 ~ $2B0,00 ag, (Due prior lo lard, lance of bulidlm3 permit) W. tcwater Tap lnspectleu Fee: Total #: ~Co~flO~lioflo O $60.00 ea. (100% due prior to lesuance of building permit) Utility Final Inspection Fee (All devdopmente): Tala] t~: 1 Lo~s · $50.00 (100% due prior to laeu~flce of building pom~t) $1,400.00 $100.00 seo,5,2 $0.00 S0.00 S30.00 S30.00 $700.O0 $50.00 $50,00 Park ~'ee (For Residential Devdopments Only): Page 1 02×10×21~5 14:20 CITY OF COPPELL ENGR. DEPT. e SRU CTR N0o82~ Q04 DEVELOPMENT FEE WORKSHEET · Prdimlnar7 plat approved: After October ~6, 1993 o o Single-remlly O $oo0 par lot Multi-lemlly O $0,o0 pet unl! (100% paid pr~r ~o Cou~ ~pI)rov~ o1 I~al plat) ~0.00 $0.00 Raadway [mpacl Yet: (See aRacMd fee calculations) Street Ught~ng Fees: Assessed for lighlln~ in the City's righ$-~f-wey. This ~e8 ~flnot De asse~ until afto~ T.U. Elec~l~ $ubmlls the IlghUng plan for the pmpOs~ dev~m~t. Once the plans am su0m~, ~2.~ ~r (100% due ~ior Io $5,050.84 Information not Ava~lab~e~ Street Sigu Fees** As~ed 1~ siol~a9o in Ne CIty's righl-of-way. (Soo Mtached he calculations ~f applicable) lnfom'~tion n~ Available Construction Inspection Fees: A copy of Ihe develoDment cofllracI mo(il Do aubmi,a¢ for o~asmenl. ~e conlmc~ shnulO I~1~ ~e co~ ~ coflstmct the Impmvem~ Ihal am inspecled ~y t~e Engining DepOsit (2% ~ o~op~nl coal r~ulmd for D~e improvers) (4% ~ ~M~enl cost req~md f~ pu~c imp~e~) Informslion no1 Available Page 2 0~×10~2005 14:20 CITY OF COPPELL ENGR. DEPT. ~ SRV CTR ROADWAY IMPACT FEE CALCULATIONS NO.B23 Q05 PROJ~,CT: DATE;: B~.r Pre.~e, ni~ ,4dd~n, Lot 1, ;Mock A RQADWAY IM~A~T $~icc Am~ · I 0 Fee ~r Vc~c~ Mik *~' ~ .... R~d~y ~pa~ Feg ~ - (Dev~m~t ~m~) x ~5 050_ 18~ VehJc~ MiI~ p~ ~vel~t Unit) x (F~ ~ V~cle Mile) ~ · (Figma 2 - Roadway Impact FCC Study) *' (Table 3 - Roadway Impact Fee ~tudy) *** ($c.~dule 2, Page ~1 - Romtway Impact Fee Study) DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NATION DATE: Hamilton Consulting BEI Properties 2/4/2005 SENT 2~/2005 ASSESSMENT Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection ~Subtotal to Eng. ASSESSED FEE AMOUNT PAlE $1,400.00 $700.00 n/a $5,050.84 to be calculated 100.00 ;50.00 ;60.52 ;60.52 ;30.00 ;30.00 ;50.00 $5,050.84 $0.00 DATE $5,050.84 TOTALS Total Fees Fees Paid Amount Owed $7,531.88 $0.00 $7,531.88 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.