Belt Line-CS021023 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To.'
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Larry Morton, Streets Division Public Works
October 23, 2002
Walk-thru Beltline (MacArthur-Denton Tap)
1. Fill holes in curb where loop wire goes through.
2. Rout and seal random cracks.
3. Fill in around guardraH support on bridge.
4. Clean up buttons on side of road.
5. Place concrete pads around pull boxes.
6. Remove temp. buttons EB at MacArthur and replace with correct pattern.
7. Clean and secure manhole covers.
8. Place reflective buttons at traffic island at Moore.
9. Replace broken pull box in brick pavers southwest corner of MacArthur/Beltline.
10. Remove yellow button on gore and replace with double row of white at Denton Tap.
11. Put double row on gore at MacArthur.
Drainaee
1. O.K.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
10/24/02 09:58
ID=CITY OF COPPELL
DATE
10/24
S,R-TIME DISTANT STATION ID MODE PAGES
00'25" 9?2 504 7041 CALLING 01
RESULT
OK 0000
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
From:
Date:
RE:
Larry Davis, Construction ln~'ctor Engineering
Larry Morton, Streets Division Public Works
October 23, 2002
Walk-thru Beltline (MacArthur-Denton Tap)
2.
3.
4.
5.
6.
7.
8.
Fill holes in curb where loop wire goes through.
Rout and seal random cracks.
Flil in around guardrail support on bridge.
Clean up buttons on side of road.
Place concrete pads around pull boxes.
Remove temp. buttons EB at MacArthur and replace with correct pattern.
Clean and secure manhole covers.
Place reflective buttons at traffic island at Moore.
9. Replace broken puli box in brick pavers southwest corner of MacArthur/Beltline.
1. O.K. '~q~
CITY OF COPPELL PUBLIC WORKS DEPARTMENT