Loading...
Belt Line-CS021023 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To.' From: Date: RE: Larry Davis, Construction Inspector Engineering Larry Morton, Streets Division Public Works October 23, 2002 Walk-thru Beltline (MacArthur-Denton Tap) 1. Fill holes in curb where loop wire goes through. 2. Rout and seal random cracks. 3. Fill in around guardraH support on bridge. 4. Clean up buttons on side of road. 5. Place concrete pads around pull boxes. 6. Remove temp. buttons EB at MacArthur and replace with correct pattern. 7. Clean and secure manhole covers. 8. Place reflective buttons at traffic island at Moore. 9. Replace broken pull box in brick pavers southwest corner of MacArthur/Beltline. 10. Remove yellow button on gore and replace with double row of white at Denton Tap. 11. Put double row on gore at MacArthur. Drainaee 1. O.K. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 10/24/02 09:58 ID=CITY OF COPPELL DATE 10/24 S,R-TIME DISTANT STATION ID MODE PAGES 00'25" 9?2 504 7041 CALLING 01 RESULT OK 0000 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS From: Date: RE: Larry Davis, Construction ln~'ctor Engineering Larry Morton, Streets Division Public Works October 23, 2002 Walk-thru Beltline (MacArthur-Denton Tap) 2. 3. 4. 5. 6. 7. 8. Fill holes in curb where loop wire goes through. Rout and seal random cracks. Flil in around guardrail support on bridge. Clean up buttons on side of road. Place concrete pads around pull boxes. Remove temp. buttons EB at MacArthur and replace with correct pattern. Clean and secure manhole covers. Place reflective buttons at traffic island at Moore. 9. Replace broken puli box in brick pavers southwest corner of MacArthur/Beltline. 1. O.K. '~q~ CITY OF COPPELL PUBLIC WORKS DEPARTMENT