Belt Line-CS021113 T H E C ] T Y 0 F
COPPELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Larry Davis, Construction Inspector~/J/~
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date:
November 13, 2002
WALK-THRU for Belt Line Road (ST 93-04) Utilities
A final walk-thru for utilities on the referenced project has been scheduled for
Thursday, November 21st at 9:00 a.m. Please meet me at the Riverside Church
of Christ parking lot located at 150 E. Belt Line Rd. (west end of Belt Line near
intersection with Denton Tap Rd.)
Please let me know ifI can be of further assistance.
CC:
Teresa Turner, E.I.T.
Suzan Taylor, CIP Coordinator
John Mears, P.E., Dallas County Dept. of Public Works
Brad w/Zachry Construction Corp. fax 972-228-0412
fax 214-653-7057
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
Ted Dutt- WALK-THRU for Belt Line Read (ST 93-04) Utilitie~ Page 1 I
From:
To:
Date:
Subject:
Rhonda Brothers
Glenn Hollowell; Ted Dutt
Wed, Nov 13, 2002 11:30 AM
WALK-THRU for Belt Line Road (ST 93-04) Utilities
A final walk-thru for utilities on the referenced project has been scheduled for Thursday, November 21st at
9:00 a.m. Please meet Larry Davis at the Riverside Church of Christ parking let located at 150 E. Belt
Line Rd. (west end of Belt Line near intersection with Denton Tap Rd.)
CC: JMears@dallascounty.org