Loading...
Belt Line-CS021113 T H E C ] T Y 0 F COPPELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Larry Davis, Construction Inspector~/J/~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: November 13, 2002 WALK-THRU for Belt Line Road (ST 93-04) Utilities A final walk-thru for utilities on the referenced project has been scheduled for Thursday, November 21st at 9:00 a.m. Please meet me at the Riverside Church of Christ parking lot located at 150 E. Belt Line Rd. (west end of Belt Line near intersection with Denton Tap Rd.) Please let me know ifI can be of further assistance. CC: Teresa Turner, E.I.T. Suzan Taylor, CIP Coordinator John Mears, P.E., Dallas County Dept. of Public Works Brad w/Zachry Construction Corp. fax 972-228-0412 fax 214-653-7057 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Ted Dutt- WALK-THRU for Belt Line Read (ST 93-04) Utilitie~ Page 1 I From: To: Date: Subject: Rhonda Brothers Glenn Hollowell; Ted Dutt Wed, Nov 13, 2002 11:30 AM WALK-THRU for Belt Line Road (ST 93-04) Utilities A final walk-thru for utilities on the referenced project has been scheduled for Thursday, November 21st at 9:00 a.m. Please meet Larry Davis at the Riverside Church of Christ parking let located at 150 E. Belt Line Rd. (west end of Belt Line near intersection with Denton Tap Rd.) CC: JMears@dallascounty.org