Loading...
Bethel Road-CS030728COPPELL July 28, 2003 Larry Shelton Southern Mechanical Plumbing, Inc 400 S. Aston Sunnyvale, TX 75182 Bethel Estates, Phase 1 Final Acceptance Dear Mr. Shelton: Representatives of the City of Coppell have confirmed a final inspection of utilities /bt the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Sin~ ~ oarnr~ca~i ioSn~ ins]pector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc; Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Terry Holmes, Holmes Builders Justin Landes, JD Landes Civil Engineering COPy ~r~No_ 560881P KNO~VALL MENEYTHEKEP~tTs that~ Southern biechan/cal Plumbing, ers Suret and I-a~__~~ ~ ..... ,ue~lt Co. = Iowa ~ mc y~{p~),~' ~ Un~~' ~ree hundred eight oneida)!m t~ ~i~ ~ _ _~, xor&~t~~~ 18,381~, w~ch~ r .... ~ ~ethal Road Estates. 25' ..... ~ z)o &260 Bethal m ~l fore ~d ~ ~[~ter. ~00~ rety & Inde~ity Co Cathy E. ~ AZ- '~ ~ ~ss ~tt~o~drt.Fat~ Inco Rd-Coppell,Tx DATE: SOUTHERN MECf. IANiC41, PL UMBffVG, ,I~VC. 400 S. ASTON SUIVArf"VALF, TEXAS 75182 PI'f: 972-226-2460 FAX: 972-226-2480 TO: CITY OF COPPELL DEPT, OF ENGINEER/NG COPPELL, TEXAS ATT1N-: LARRY DAVIS - CONSTRUCTION INSPECTOR CITY OF COPPELL LETTI[iR OF CONTRACT QUANITI~S IN PUBLIC EASEMENTS AND RIGHT-OF-WAYS BETHEL ROAD ESTATES 256 & 260 BETHEL ROAD COPPELL, TEXAS 75019 LOTS ! & 2, BLOCK 1 J.W. ~N-DERSON, ABST. NO. I8 DALLAs COUNTy ITgM DESCRIPTION UNIT/QTY. WATER: l" TAP & DEAD/lEAD 2 EA TESTING/CLORINATION ILS WATER TOTAL: 12" SDR-35 PWE 285 LF 12" SDR-25 PIPE 28 LF 12" ROADBoRE W/CASING(DRY)20 LF CONNECT. TO EXIST. M/H ]EA CUT&PLUGEXIST. 10" S~WER 2 FA. REIViOVE EXIST. 10" LATER/AL 234 LF CEMENT STABrrJT_ED BACICqLL 9 LF 4' S,S.MH. OVEREXIST. 12" 1EA 4' S.S.M,H. ~ STA. 2+6938 I EA 4" WY~ C.O, W/LAT. pt~ING 2EA ASPHALT STREET CUT/PATCH 6 SY TESTING/TRENcH SAFETY ILS TRAFFIC CONTROL 1 LS SEWER TOTAL: TOTAL OF ALL ITEMS: UNIT COST TOTAL 2,14f00 EA 4,290.00 390.00 PER 390.00 $4,680.00 26,60 PLF 7,581.00 28.60 PLF 800.80 234.00 PLF 4,680,00 1,1)40.00 pER 1,0¢0.00 845,00 EA 1,690,00 16.90 PLF 3,954,60 65.00 PLF 585.00 2,957.50 PER 2,957.50 2,320.50 PER 2,320.50 708.50 PER 1,417.00 541.70 PSY 3,250.20 1,170.00 LS 1,170.00 637.00 LS 637.00 $32,083.60 THESE NUMBERS ONLY REFLECT THOSE UANIT1ES/lq' CI Q TY RIGHT-OF-WAYS AND EASEMENTS. PLEASE CALL IF YOU HAVE ANy QUESTIONS. THANK YOU, LARRY SHULTON PROJECT MANAGER. SM. PI. Fflc:814loq01