Bethel Road-CS030521 T H E: G I T Y 0 F
C OPPELL
P.O. Box 478
255 Parkway Bird
Coppell, TX 75019
Phone: (972)304-3681
Fax: (972)304-3570
ENGINEERING DEPARTMENT
FAX CO VER SHEET
To: Terry Holmes From: Teresa Turner
Fax: 972-242-2931 Date: 5/21/2003
Phone: 972-242-1770 ext. 201 Pages: 6 (including cover sheet)
Re: Bethel Road Estates CC:
[] Urgent r-IFor Review [] Please Comment [] Please Reply [] As Requested
Terry:
I have attached the revised and original fee assessments reflecting the changes due since the domestic
meter sizes for this development were increased. The water and wastewater impact fees must be paid
at the Building Inspections Department. The remainder of the fees will be collected at the Public
Works Service Center, 816 S. Coppell Road.
I have also attached an example of a letter that you can use for the off-site grading approval.
If you have any questions, please contact me at 972-304-3681.
CC:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn l-lcdln,mell Ass~stanl, Director' of Public,,, Works
~ · =.,, .. ., /.
~reg Jones, Lluei DUll(ling UII1Clal
Brad Reid, Director of Parks and Recreation
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679
"City of Coppell Engineering- Excellence By Design"
Project:
Date:
DEVELOPMENT FEE TABLE
Bethel Road Estates, Lots 1 & 2, Block 1 - REVISED
5/20/03
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,400.0~
(100°/o due at Issuance of Building Permit) ~::~ ·
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter(100% due at Issuance of Water Meter)Fee (Domestic)
Water Meter Fee (Irrigation/Fireline)~f''' ~0.00 ,//
(100% due at Issuance of Water Meter)
'Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter) ~5~..
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $2,570.00 / $2,570.00
(100% due prior to Council Approval)
Roadway Impact Fee $1,710.00 ~ $1,710.00
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance o f Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
FOTAL $7,564.50
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $4,280.00
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Bethel Road Estates, Lots 1 & 2, Block 1 - REVISED
5/20/03
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
2 · 1 inch = 5 ESU's
0 = 0 ESU's
0 = 0 ESU's
0 · 10 inch = 0 ESU's
Total #: 5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #:
2 Connections @ $50.00 ea.
(Singte family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #:
2 Domestic Meter(s) @ $62.25
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to ~ssuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5
(Due prior to issuance of building permit)
$280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total ¢¢: 2 Lots @ $50,00 ea.
(100% due prior to issuance of building permit)
$1,400.00
$100.00
$124.50
$o.oo
$0.00
$o.oo
$6O.OO
$o.oo
$1,400.00
$100.00
$1oo.oo
Zone 1
$2,570.00
$o.oo
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
2 Single-family @ $1,285.00 per lot
0 Multi-family @ $1,285.00 per unit
(50% paid prior to Council approval of final plat)
Page 1
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$1,710.00
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of.way.
(See attached fee calculations if applicable)
information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Bethel Road Estates, Lots 1 & 2, Block 1 - REVISED
5/20/03
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Residential
Land Use ** Single-Family Detached
No. Lots/Units 2
Development Units ** 2.00
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
IVehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $1,710.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
DEVELOPMENT FEE TABLE
Estates, Lots I & 2, Block 1
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $900.00 $900.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100 % due at Issuance of Water Meter)
Water Meter Fee (Domestic) $51.34
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $70.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $900.00 $900.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $I00.00
(100% due at Issuance of Building Permit)
Park Fee $2,570.00 $2,570.00
(100% due prior to Council Approval)
Roadway Impact Fee $1,710.00 i $1,710.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
tOTAL $6,501.34
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,080.00