Loading...
Big Cedar-CS 921119COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: November 19, 1992 Garreth Camgbell, Construction Insp~tor Rey Gonzales, Street Superintenden~ Walk Through for Bethel School Road/Harris Street on 11/19/92 Staff performed a preliminary walk through on this project today. The following deficiencies were found: 1. Bethel School at Harris intersection; S.W.A.D.A. ramp has a birdbath. 2. Harris Street - Random crack running east and west/route and seal. 3. Route and seal all header joints at the curb. 4. Drop inlets need to be sealed - Ail. 5. Harris/Bethel School @ N.W. corner; existing curb was damaged and needs to be replaced. Please make sure that the contractor gets a copy of this punch list and that you provide me with a 24 hour notice to check on the completion of these items. RG/bc STBSRH.RG