Big Cedar-CS 921027COPPELL PUBLIC WORKS
MEMORANDUM
DATE: October 27, 1992
TO: Shohre Daneshmand, Civil Engineer ~ '_/~
FRO.: Howard Pafford, Water Sup,~nt ~d~ .-~,~,~..x~__~~'"
RE: Water/Sewer Impact Fees %Big Cedar Additi°~
I met briefly with Tim House this morning to dlscuss~the above
referenced matter. In the original development fee assessment,
the project was assessed at 41 lots. However, the plat was later
modified to 40 lots and the developer had paid the original
assessment fee.
Mr. House is asking that the city use the fee collected for the
41st lot in place of the 5/8" x 3/4" irrigation meter impact fee.
I informed Mr. House that I did not have a problem with this and
that the developer was actually still due a reimbursement for the
wastewater impact and the park fee on the 41st lot not in the
modified plat.
By copy of this memorandum I am informing Carolyn Bebermeyer of
this so that she may proceed with this reimbursement totalling
$497.00. (Wastewater Impact $422.00 and 50% Park Fee at $75.00).
Please pass this information on to the developer so they may
proceed with the closing of their project.
If you have any questions regarding this matter, please advise.
HLP/sm
cc: Steven G. Goram, Director of Public Works
Carolyn Bebermeyer, Accounting Clerk
attachments
CARMEN & STREET
A TEXAS GENERAL PARTNERSHIP
PO. BOX 517
COPPELL, TEXAS 75019
I ;LL MONEY MARKET ACCOUNT
CITY OF COPPELL
DEVELOPMENT FEES
Date: October 21, 1991
Project: Big Cedar Addition
Total
Assessment
Amount Due
Prior to
Council
Approval
Park Fee
(50% payable prior to Council Approval)
(50% payable with Building Permit)
6,150.00
$ 3,075.00
Water Impact Fee
100% due prior to Council Approval)
$27,060.00
$27,060.00
Water Tap Inspection Fee
100% due at Issuance of Building Permit
$ 4,100.00
Wastewater Impact Fee
100% due at Issuance of Building Permit
$i7,302.00
$17,302.00
Sewer Tap Inspection Fee
100% due at Issuance of Building Permit
4,100.00
Street Sign Fee
(100% due prior to Council Approval)
$ 392.36
392.36
Street Light Fee
(100% due prior to Council Approval)
Construction Inspection Fee
(100% due prior to Council Approval)
(2% of project construction cost to
be provided by the Developer's
Engineer]
TOTALS
$59,104.36
$47,829.36
TOTAL AMOUNT DUE PRIOR
TO COhS~CIL APPROVAL:
$47,829.36
Plus 2%
Construction
Inspection Fee
* This fee cnnnot be assessed until after TU Electric submits the lighting
plan for the proposed project. Once the plan is submitted, $292.60 per
light will be assessed.
Note: This project is NOT within the Coppell Municipal Utility District No.
1. Therefore, the Wastewater Impact Fee is due prior to Council
Approval.
BIG1
PUBLIC WORKS
MENORA~DUM
September 27, 1991
shohre Danes~m~ud, A~tingCity Engineer
public Works Staff '
Development Fees for Big Cedar Addition
UP..,
The following fees should be assessed on the above referenced
project.
Water r.~ act Fee:
41 - 5/8' x 3/4"
Domestic Meter/s = 41 ESU's
Irrigation Meter/s = ESU's
Fireline Meter/s = ESU's
Total 41 ESU'.s ~ $660.00 ea= $27,060.00
100% due prior to Council approval of final plat.
Waste~ter r.~ act Fee:
41 - 5/8" x 3{4" Domestic Meter/s = 4--1 ESU's ~ $422.00 = $17,302.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District ~1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
41 Connections 8 $100.00 each = $4,100.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee N/A
4I Connections 6 $100.00 each = $4,100.00
I00% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note:
This fee cannot be assessed until after TU Electric s~bmits
the lighting plan for the proposed project. Once plan is
s,,bm~tted $292.60 per light will be assessed.
Street Sig~s Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
41
Residential Lots at $150.00 each = $6,150.00
Units (Multi f~m~ly) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
cc:
Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Biq Cedar Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance ]~ppendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 2 $ 127.08
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60 2 $ 23.20
Stop & Street Combo $ 96.85 2 $ 193.70
O~'~R
Cu~e siqns $ 48.38 1 $ 48.38
$
$
TOTAL $ 392.36
* Cost breakdowns may be obtained from Public Works by written
request.