Loading...
Big Cedar-CS 920629 (2)COPPELLPUBLIC WORKS DATE: FROM= June 29, 1992 Larry Davis, Construction Insgector Rey Gonzales, Streets Superintenden~ Big Cedar Preliminary Walk Thru Please see attached list copy to the contractor. for the follow-up. for deficiencies and provide a Provide me with a 24 hour notice If you have any questions please advise. RG/dg CEDAR.RG PRELIMINARY WALK-THRU 6-26-92 "BIG CEDAR" PUNCH LIST Check joints- seal still low in spots Random cracks- 2 (1 on Leigh Crt./1 on Brock) Mud Ball/deformation of concrete near & on Brock Grout around 1st pipe connection in inlet on the north side of Brock Pavers incomplete NOTE: Cobble Rip-rap used at outfall of RCP- may not stop erosion Letter concerning access from project Engineer to City Engineer needs to be copied to Public Works.