Loading...
Big Cedar-CS 920317COPPELL PUBLIC WORKS TO= FROM= March 17, 1992 ~ Steven G. Goram, Director of Public Wor~/ Howard L. Pafford, Water Superintendent~ Big Cedar Addition Temporary 2" Construction Water Tap (Tickler 3/17/92) I have spoken with the contractor and informed him that he would be required to make a tap and run copper to the surface. Once he had accomplished this, he could put up a deposit and have a construction meter delivered to his work site. If it is necessary to follow up, please advise. HLP\Um BIGCEDAR. HLP