Big Cedar-CS 920317COPPELL PUBLIC WORKS
TO=
FROM=
March 17, 1992 ~
Steven G. Goram, Director of Public Wor~/
Howard L. Pafford, Water Superintendent~
Big Cedar Addition Temporary 2" Construction Water
Tap (Tickler 3/17/92)
I have spoken with the contractor and informed him that he would be
required to make a tap and run copper to the surface. Once he had
accomplished this, he could put up a deposit and have a
construction meter delivered to his work site.
If it is necessary to follow up, please advise.
HLP\Um
BIGCEDAR. HLP