We are enclosing a copy of the City of Coppell Development Fee Assessment
List along with copies of the development fee calculations for the Big Cedar
Addition to the City of Coppell.
Please provide a check made payable to the City of Coppell in the amount of
$47,829.36 plus 2% of the construction cost, and forward it to Mr. Alan
Johnson, Assistant Finance Director, along with a copy of the Fee Assessment
List. In addition, please provide our office with a copy of your Engineer's
estimate for this project or contract amount for verification of the
construction inspection fee.
Please provide a copy of your paid receipt to our office and to Shimek,
Jacobs & Finklea, Attn: Mr. Gary C. Hendricks. Copies of your receipts will
help us verify payment of the required fees and assure a timely beginning of
this project.
We look forward to working with you on this project.
questions, please do not hesitate to contact me.
Sincerel~~
Acting City Engineer
If you have any
Enclosures
cc:
Mr. Gary L. Sieb, Director of Planning and Community Services
Mr. Frank Trando, Finance Director
rl A
lan Johnson, Assistant Finance Director
Steve Goram, Director of Public Works
Mr. Gary C. Hendricks, P.E., Plan Review Engineer
CITY OF COPPELL
DEVELOPMENT FEES
Date: October 21, 1991
Project: Big Cedar Addition
Total
Assessment
Amount Due
Prior to
Council
Approval
Park Fee
(50% payable prior to Council Approval)
(50% payable with Building Permit}
6,150.00
3,075.00
Water Impact Fee
(100% due prior to Council Approval)
$27,060.00
$27,060.00
Water Tap Inspection Fee
(100% due at Issuance of Building Permit)
$ 4,100.00
Wastewater Impact Fee
(100% due at Issuance of Building Permit}
$17,302.00
$17,302.00
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit}
$ 4,100.00
Street Sign Fee
(100% due prior to Council Approval)
$ 392.36
$ 392.36
Street Light Fee
(100% due prior to Council Approval)
Construction Inspection Fee
(100% due prior to Council Approval)
{2% of project construction cost to
be provided by the Developer's
En§ineer)
TOTALS
$ $
$59,104.36
$47,829.36
TOTAL AMOUNT DUE PRIOR
TO COUNCIL APPROVAL:
$47,829.36
Plus 2%
Construction
Inspection Fee
* This fee cannot be assessed until after TU Electric submits the lighting
plan for the proposed project. Once the plan is submitted, $292.60 per
light will be assessed.
Note: This project is NOT within the Coppell Municipal Utility District No.
1. Therefore, the Wastewater Impact Fee is due prior to Council
Approval.
BIG1
DATE :
COPPELL PUBLIC WORKS
REHORANDUW
September 27, 1991
Shohre Daneshmand, A~ting City Engineer
Public Works Staff''~' ~ ~
Development Fees for Big Cedar Addition
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
41 - 5/8" x 3/4"
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
41
ESU's
ESU's
ESU's
Total 41 ESU's ~ $660.00 ea = $27,060.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee:
41 - 5/8" x 3/4" Domestic Meter/s = 4__1ESU's ~ $422.00 = $17,302.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District %1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
41 Connections ~ $100.00 each = $4,100.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee N/A
41 Connections @ $100.00 each = $4,100.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note= This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
41
Residential Lots at $150.00 each = $6,150.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G, Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Biq Cedar Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN .UNIT PRICE QUANTITY
EX_~_~ENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 2
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60 2 $ 23.20
Stop & Street combo $ 96.85 2 $ 193.70
OTHER
Curve siqns $ 48.38 1 $ 48.38
$
TOTAL $ 392.36
$ 127.08
* Cost breakdowns may be obtained from Public Works by written
request.