Big Cedar-CS 910927COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
September 27, 1991
shohre Daneshmand, A~ting City Engineer
Public Works Staff ~WA ~':, ,~
Development Fees for Big Cedar Addition
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
41 - 5/8" x 3/4"
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
41
ESU's
ESU's
ESU's
Total 41 ESU's ~ $660.00 ea = $27,060.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee:
5/8" x 3/4" Domestic Meter/s = 41ESU's ~ $422.00 = $17,302.00
100% due prior to Council approval of final plat.
~ Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
41 Connections ~ $100.00 each = $4,100.00
100% due prior to issuance of building permit.
Hewer Tap Inspection Fee N/A
41 Connections ~ $100.00 each = $4,100.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note:
This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
41
Residential Lots at $150.00 each = $6,150.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Biq Cedar Addition
The following assessment is being made in accordance with the City
of CoppeI1 Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 2. $ 127.08
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60 2 $ 23.20
Stop & Street Combo $ 96.85 2 $ 193.70
OTHER
Curve siqns $ 48.38 1 $ 48.38
$
$
TOTAL $ 392.36
Cost breakdowns may be obtained from Public Works by written
request.
BIGCEDAR