Loading...
Big Cedar-CS 910927COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: September 27, 1991 shohre Daneshmand, A~ting City Engineer Public Works Staff ~WA ~':, ,~ Development Fees for Big Cedar Addition The following fees should be assessed on the above referenced project. Water Impact Fee: 41 - 5/8" x 3/4" Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = 41 ESU's ESU's ESU's Total 41 ESU's ~ $660.00 ea = $27,060.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: 5/8" x 3/4" Domestic Meter/s = 41ESU's ~ $422.00 = $17,302.00 100% due prior to Council approval of final plat. ~ Note: If property to be developed is in the Coppell Municipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 41 Connections ~ $100.00 each = $4,100.00 100% due prior to issuance of building permit. Hewer Tap Inspection Fee N/A 41 Connections ~ $100.00 each = $4,100.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 41 Residential Lots at $150.00 each = $6,150.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for Biq Cedar Addition The following assessment is being made in accordance with the City of CoppeI1 Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 2. $ 127.08 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 2 $ 23.20 Stop & Street Combo $ 96.85 2 $ 193.70 OTHER Curve siqns $ 48.38 1 $ 48.38 $ $ TOTAL $ 392.36 Cost breakdowns may be obtained from Public Works by written request. BIGCEDAR