Blooming Colors-CS 931229DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMORANDUM
December 29, 1993
Ken Griffin, P.E., City Engineer
The following fees should be assessed and collected on
referenced project.
Water Impact Fee:
1 5/8" x 3/4" = 1 ESU
1 - 1 1/2" 5 ESU's
Domestic Meter/s
Irrigation Meter/s =
the above
Total 6 ESU's @ $650.00 ea = $3,900.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 5/8" X 3/4" Domestic Meter/s = 1
Total 1 ESU's @ $450.00 ea = $450.00
100% due prior to Council
ESU's
approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $i00.00 each = $200.00
100% due prior to issuance of meter/s.
Utility Final Inspection Fee
1 lots ~ $50.00/10t = $50.00
100% due prior to issuance of building permit.
Water Meter Fee
1 5/8" X 3/4" Domestic Meter/s @ $22.25
100% due prior to issuance of building permit.
ea = $22.25
Water Meter Fee (Irrigation)
1 - 1 1/2" Irrigation Meter/s @ $157.00
100% due prior to issuance of water meters.
ea =
$157.00
Meter Deposits
2 meters @ $35.00 ea $70.00
100% due prior to issuance of water meters.
HLP/dm
cc: Steven G. Goram, Director of Public Works
FEES.BLOOMING