Loading...
Blooming Colors-CS 931229DATE: TO: FROM: RE: COPPELL PUBLIC WORKS MEMORANDUM December 29, 1993 Ken Griffin, P.E., City Engineer The following fees should be assessed and collected on referenced project. Water Impact Fee: 1 5/8" x 3/4" = 1 ESU 1 - 1 1/2" 5 ESU's Domestic Meter/s Irrigation Meter/s = the above Total 6 ESU's @ $650.00 ea = $3,900.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 5/8" X 3/4" Domestic Meter/s = 1 Total 1 ESU's @ $450.00 ea = $450.00 100% due prior to Council ESU's approval of the final plat. Water Tap Inspection Fee 2 Connections @ $i00.00 each = $200.00 100% due prior to issuance of meter/s. Utility Final Inspection Fee 1 lots ~ $50.00/10t = $50.00 100% due prior to issuance of building permit. Water Meter Fee 1 5/8" X 3/4" Domestic Meter/s @ $22.25 100% due prior to issuance of building permit. ea = $22.25 Water Meter Fee (Irrigation) 1 - 1 1/2" Irrigation Meter/s @ $157.00 100% due prior to issuance of water meters. ea = $157.00 Meter Deposits 2 meters @ $35.00 ea $70.00 100% due prior to issuance of water meters. HLP/dm cc: Steven G. Goram, Director of Public Works FEES.BLOOMING