Loading...
Blooming Colors-PT 940405Bore/Excavation in Public Right-Of-Way Permit City of Coppe!l - Public Works Department Date: Permit Issued To: Name: Address: Phone: Emergency Phone: Project Name: Representing: Inspector: Type of Work/General Description: IIave ~1 City and/or Franchise Utilities Been Contacted and Existinq Utilities Located: ~ YES NO Will It Be Necess~ to Excavate Street, ~ley or Sidewalk Payment? YES (attach pe~it) ~ NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street reported to the Police, Fire, and Public Works to closing (462-1144, 462-1133 and 462-8495). or alley must be Departments prior Attach Work Order (Franchise Only) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franchise/Contractor Representative Date Franchise Inspector/or City Inspector I~_uy R~resen=a~ive Date Applicant shall indemnify and forever hold harmless agains= each and even! claim, demand o~ cause of action than may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such pezTait is granted. PER.MIT. PIIB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * No WETBORESALLOWED!