Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Boren Addition-CS000602
/~ The City With A Beautiful Future ~ P.O I~OX 478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell. Texas 75019 972-462-0022 June 2, 2000 Cody Boren 925 Warren Court Coppell, TX 75019 Boren Addition Fee Assessment Letter Park Development Zone: Zone 2 Dear Mr. Boren: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $5,225.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Plat approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depa~buent will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. It' you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer CCi Jennifer Armstrong, Finance Director Debbie Ingram, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director o f Leisure Services DEVELOPMENT FEE TABLE Project: Boren Addition Date: 06/02/2000 TOTAL AblOUNT DUE FE.F~S DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $900.00 $900.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Iss.ance of Water Meter) Water Meter Fee (Domestic) $51.34 (100% due at Issuance of Water Meter) Water Meter Fee (IrrigationfFireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (I00% due at Issuance of Water Meter) Wastewater Impact Fee $900.00 $900.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100 % due at Issuance of Building Permi0 Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $2,570.00 $2,570.00 (100% due prior to Council Approval) Roadway Impact Fee $855.00 $855.00 (100% due prior to Council Approval) Street Light Fee Information aot Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (i00 % due prior to Acceptance of Project Construction Inspection Fee information not Available tOTAL $5,646.34 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,225.00 DEVELOPMENT FEE WORKSHEET PROJECT: Boren.4~4;~;on DATE: 06/02/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 5/8 inch X 3/4 inch = 2 ESU's 0 = 0 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 2 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections ~ $50.00 ea. (Single family due prior to issuance of bu~ing permit) (PJI other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $25.67 (Single family due prior to issuance of building permit) (AJI other developments due prior to issuance of meter) Irrigatioa/Fireline Water Meter Fee: Total #: 0 In'igation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) ~ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due pdor to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 2 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due pdor to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $900.00 $100.00 $51.34 $0.00 $0.00 $70.00 $900.00 S100.00 $100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * PreUminary plat approved: After October 26, 1993 · Park Development Zone: 2 Single-family ~ $1.285.00 per lot 0 Multi-family ~ $1,285.00 per unit (50% paid prior to Counci~l approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) S~'eet Lighting Fees: Assessed for lighting in the City*s right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan far the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Zone2 $2,570.00 $0.00 $855.00 Inf~,mt;on,rmt Available Street Sign Fees: Asssssed for signage in the Cily's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted far assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required far public improvements) Information not Available P~e2 ROADWAY IMPACT FI~E CALCULATIONS PROJECT: Bortn DATI~: 06/02/2000 ~tOADWAY I~[PACT 1~: ~vice A~a * 3 Category ** Resid~*~ [..ami Use ** ~in~le-Famil~ Detached No. Lots/Units 2 ~evelopment Units ** 2.00 ~/ehicle Miles per Development Unit ** 2.85 ~eo ]~r Vehic~ Mile *** $'~00 .~.oadway ~ .~ct Fee due .~ (Developtnent Units) x ~Vehic~e t, ft~ ~r t~-velopm~ ~nit) x (~ per Ve~icte MUe) .- St.?t0.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Credit for ~g Home WhitePages.com - Your Intemet White Pages Page 1 of 1 ]une 14, 2000 find a person share your find an area code find a zio code make a map find a web site international directories toll free numbers Find Person: BOREN in COPPELL, TX ~ new search <<prev 10 Listings 1-1 Boren, Cody and Elizabeth 911 Mill Trl Coppell, TX 75019-7318 Phone: 972-393-8626 Find old hioh school friends next 10 >> Call Now Send Free Flowers <<prev 10 Listings 1-1 new search next 10 >> Cool Links find person [find area code I find zio code lmake map I find web site international directories I toll free numbers help I link to us I advertising I jobs I contact us Copyright ©1996-2000 WhitePages.com. All rights reserved. http://.../find~person_results.pl?f=&l=Boren&c=Coppell&s=TX&o=0&Enter.x= 10&Enter.y= 6/16/00