Loading...
Switching Sta-AG 930209 (2) AGENDA REQUEST FORM CITY COUNCIL MEI~TING February 9, 1993 ITEM NUMBER ITEM~ PUBLIC HEARING: To consider approval of a zoninE chanEe request) Case ~S-1041(A), for an amendment to an SUP site plan for an electrical substation, located at the northwest comer of Th~eatt Road and Coppell Road, at the request of Brazos Electric Cooperative, SUBMITTED BY: ~ EVALUATION OF ITEM: Date of P K Z Meeting: January 21, 1993 STAFF REP.: Planning Director. [~ary L. Sieb OTHER REP.: DATE: Decision of P ~ Z Commi~mion: Approved (6-0) x~ith the following conditions: 1) that TU Electric and Brazos Electric Cooperative would enter into an asreement ~ith the City of Coppell that relieves both electric cmapanies of pavin~ Thweatt Road and Coppell Road, continEent upon the dedication of right-of-~ay for both roads to the City of Coppell, and also donation of right-of-~ay for the old po~er and light easement, which parallels Sandy Lake Road; 2) TU Electric and/or Brazos Electric Cooperative~rill pay for relocation of the line at the time the City indicates the upgrade and i~prove~ent of Sandy Lake Road; 3) more camplete landscaping alone Th~eatt Road and Coppell Roadvhen the roads are finished; and 4) including the four variances requested Please see attechedstaff report for further details. BUDGET AMT. AMT +/- BUDGET N/A LEGAL REVIEW BY: t CASE #: P & Z HEARING DATE: C. C. HEARING DATE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT S-1041(A) - ELECTRICAL SUBSTATION January 21, 1993 February 9, 1993 LOCATION: The northwest comer of Thweatt Road and Coppell Road. SIZE OF AREA: 2.72 Acres of land. REQUEST: Approval of an amendment to a site plan, to allow the expansion of the electrical substation. APPLICANT: Brazos Electric Cooperative Representative: Mr. A1 Petter Right-of-Way Department 2404 Lasalle Avenue Waco, Texas 76702-2585 (817) 750-6500 HISTORY: An S.U.P. and a plat were approved for the switching station, at the request of T.U. Electric in 1989. TRANSPORTATION: The property is situated at the intersection of Thweatt, Coppell and Sandy Lake Roads. Thweatt and Sandy Lake Roads are classified as (C4D/6) divided thoroughfares with 100-110 feet of right-of-way; Coppell Road is planned to be a (C2U), an undivided street contained within a 60 foot right-of-way. ITEM 5 SURROUNDING LAND USE & ZONING: North - vacant; LI South - single-family; PD-SF East - vacant; R West - vacant; R & C ANALYSIS: Brazos Electric Cooperative is seeking approval to allow expansion of the subject substation. The applicant wishes to complete the inter-connection between Brazos Electric and TU Electric at the Coppell Substation. The inter-connection will allow for an exchange of electrical power between the two utilities. If either of these utilities loses a transmission line or elects to take it out of service, this substation can remain operative with power from the other line. Presently, the Brazos Electric line along Thweatt Road and Coppell Road merely passes through the substation without inter-connecting. Brazos Electric proposes to construct three 48 foot six inch towers inside the substation. These towers will be 13 feet shorter than the existing tower in the substation. The existing screening fence and landscaping will be extended 90 feet along Thweatt Road and 90 feet along Coppell Road. Approximately 235 feet of screening fence exists along Thweatt Road and 215 feet of screening fence exists along Coppell Road. Additional landscaping and new fencing will be installed as was required by the City Council in 1989. The final plat for the Coppell Switching Station was approved with the provision that TU Electric would be relieved of paving Thweatt Road and Coppell Road, contingent upon TU's dedication of right-of-way for both roads, and also donation of right-of-way for the old Brazos Power and Light easement, which parallels Sandy Lake Road. TU Electric will pay for the line at the time the City initiates the upgrade and improvement of Sandy Lake Road. Because TU Electric has frontage on Coppell Road and Brazos Electric owns property along both Coppell and Thweatt Roads the City will initiate an agreement which includes both utilities and the City of Coppell. The following variances were requested along with this site plan amendment: 1) Using rock vs. concrete for yard surface 2) Open ditch drainage 3) Minimum landscaping to be done at this time (complete landscaping to take place when the street is widened) 4) Rock instead of concrete drive (concrete drive to be added when street is widened) Staff has no objections to the approval of the variances; however, the conditions of approval should be placed on the site plan as well. ALTERNATIVES: 1) Approve the site plan amendment 2) Deny the site plan amendment 3) Modify the site plan amendment ATTACHMENTS: 1) Site plan 2) Zoning exhibit 3) Letter requesting variances 4) City Manager's comments (6-13-89) sl041a, stf BRAZOS ELECTRIC COOPERATIVE BRAZOS ELECTRIC pOWER COOPERATIVE, INC 2404 LaSalle A~enue · PO Box 2585 Waco, Texas 76702 2585 (8171 750 6500 FAX (817) 750-6290 January 6, 1993 Coppell City Council & Coppell Planning & Zoning Committee 255 Parkway Blvd. Coppell, Texas 75019 Re: Zoning Application, Coppell Substation, Brazos Electric Power Cooperative, Inc. Gentlemen: Along with the above referred to Zoning Application, Brazos Electric hereby requests the following variance, which is identical to the variance granted to TU Electric in 1989 for this same substation site: Using rock versus concrete for yard surface. Open ditch drainage. Minimum landscaping to be done at this time (complete landscaping to be done when street is widened). Rock instead of concrete drive (concrete to be added when street widened). We will be happy to discuss this with you or your staff. Very truly yours, Albin A. Petter, P.E. Environmental & Land Acquisition Manager CITY MANAGER'S COMMENTS AND/OR RECOMMENDATIONS Item # i ! City Council Meeting: 6-13-89 The attached letter was hand-delivered to Mr. Tom Parsons, District Manager, TU Electric. Mr. Parsons has indicated that this letter reflects our negotiated agreement. In general, TU will donate the right-of-way for Coppell and Thweatt Roads at this site and the Old Brazos Light right-of-way along Sandy Lake Road, as well as the cost of relocating that line within our right- of-way when Sandy Lake is improved. In return for this we recommend you agree not to assess TU for the street paving costs. We believe that this agreement will result in significant cost savings to the City in the future right-of-way acquisition and utility power line relocations. We recommend you approve this plat and include this condition in the motion approving this plat. You can instruct the City Attorney to draft any necessary legally binding documents to secure this commitment before the plat is signed by the Mayor. Ju~e = t9S~ Mr. Tom Parsons District Manager IU Electric 14400 Josey Lane Farmers Branch, TX Dear Mr. Parsons: We will place an item on Coppell's City Council's June 13th agenda for approval of TU Electric's final plat. As discussed, I will recommend to the council that TU be relieved of the cost of paving, contingent upon TU's dedication of right-of-way for both Coppell and Sandy Lake Roads, as well as your agreement to donate the right-of-way for the old Brazos Power and Light easement which parallels Sandy Lake Road. TU Electric will pay for relocation of this line at the time the City initiates the upgrade and improvement of Sandy Lake Road. Let me know if this is not consistent ~ith what was discussed at our recent meeting. We will also require that TU provide executed easements for the right-of-way for Coppell and Thweat Roads. sincerely, Alan D. Ratliff City Manager ADR/dgc Attachment xc: Larry Jackson, City Attorney bxc: Mayor and city Council