Loading...
ST9302-LR 990422ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: CITY OF COPPELL DATE: 04/22/99 COPPELL, TEXAS PROJECT: SANDY LAKE ROAD OUR REPORT NO: 98881-25 PROJECT NO. ST 93-02 COPPELL, TEXAS TECHNICIAN: D.H. WEATHER: CLEAR TEMPERATURE RANGE: 75 TO 80 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED, WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: SANDY LAKE ROAD AT STATION #28 +00 A TOTAL OF 4 FIELD DENSITY TESTS WERE PERFORMED ON FILL FOR UTILITIES. SEE ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW oN A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. RespeC~~~bmi~ ALPHA TESTING, INC. Geotechnical Englne~i~ · Construction Materials Tesflna m Envirnnrr~nt~l Fr~in~.rina · Consulting T' I I'll' l~ I ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 4/22/99 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-25A PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLAC~ IN PLACE PERCEN~ NO. DATE DEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT" % PCF % P~ 49 4/22/99 FG-4.5 5 13.5 111.9 14.5 111 99 1-A 50 4/22/99 FG-3.0 5 13.5 111.9 15.5 109 97 1-A 51 4/22/99 FG-2.0 5 13.5 111.9 16.5 108 97 1-A 52 4/22/99 FG 5 13.5 111.9 15.3 112 100 1-A TEST LOCATION: 49 ~30" WATER LINE NORTH SIDE SANDY LAKE ROAD AT STATION #28+20 50 30" WATER LINE NORTH SIDE SANDY LAKE ROAD AT STATION #28 + 10 51 30" WATER LINE NORTH SIDE SANDY LAKE ROAD AT STATION #28+00 52 30" WATER LINE NORTH SIDE SANDY LAKE ROAD AT STATION #27+90 ½ 1, FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED ~ A.IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B.PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C.PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D.RETEST Geotechnical E~ · Constructk~n Materfab Tes#na · Environmental Engineeri~ · Consulting ~ T' ! l' ~,' 1~ I