Brighton Manor-CS050222T H E C I T Y 0 F
COPPELL
February 22, 2005
Mr. Rodney Louviere
Dowdey, Anderson & Associates
5225 Village Creek Drive, Suite 200
Plano, TX 75093
RE: Brighton Manor
Fee Assessment Letter, Revised
Dear Mr. Louviere,
Enclosed is a revised copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development. A credit of $458.13 from the
2/18/2004 assessment was requested due to the reduction of a 1" irrigation meter to a V4" irrigation meter
at your request.
If you have any questions, please contact me.
Sincerely,
Charlene La Mattina, E.I.T.
Graduate Engineer
CC:
Jennifer Am~strong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
DEVELOPMENT FEE TABLE
Project: Brighton Manor
Date: 2/22/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $9,800.00
(100% due at Issuance o£ Building Permit)
Water Tap Inspection Fee $1,400.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $545.48
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $212.15
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $780.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $7,280.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $ 1,300.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,300.00
(100% due at Issuance of Building Permit)
Park Fee $33,410.00 $33,410.00
(100% due prior to Council Approval)
Roadway Impact Fee $22,230.00 $22,230.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) Il
TOTAL $78,317.63
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $55,640.00
DEVELOPMENTFEE WORKSHEET
PROJECT: Brighton Manor
DATE: 2/22/2005
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
26 - 5/8 inch X 3/4 inch = 26 ESU's
I - 5/8 inch X 3/4 inch = 1 ESU's
1 - 2 inch = 8 ESU's
0 0 ESU's
Total #: 35 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 28 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 26 Domestic Meter(s) @ $20.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $23.67
Total #: 1 Additional Irrigation Meter(s) @ $188.48
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 26 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 26
(Due prior to issuance of building permit)
@ $280.00 ea,
Wastewater Tap Inspection Fee:
Total #: 26 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 26 .L°ts @ $50.00 ea.
(100% due prior to issuance of building permit)
$9,800.00
$1,400.00
$545.48
$23.67
$188.48
$0.00
$780.00
$6O.OO
$7,280.00
$1,300.00
$1,300.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENTFEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
26 Single-family @ $1,285.00 per lot
0 Multi-family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Zone 2
$33,410.00
$0.00
$22,230.00
In~rmation not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Depadment.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Brighton Manor
DATE: 2/22/2005
ROADWAY IMPACT FEE:
Service Area * 3
Category ** Residential
Land Use ** Single-Family Detached
No. Lots/Units 26
Development Units ** 26.00
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $22,230.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2. Page 3 - Roadway Impact Fee Study)