Loading...
Brighton Manor-CS040206 DEVELOPMENT FEES PROJECT NAME: Brighton Manor ENGINEER: Dowdey, Anderson & Assoc ORIGINATION DATE: 2/6/2004 SENT 2/18/2004 4/8/2004 4/8/2004 3/24/2004 4/12/2004 4/19/2004 ASSESSMENT Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irri9) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection []Subtotal to En~. TOTALS ASSESSED FEE AMOUNT PAID DATE $10,220.00 $2,940.00 mb 2/16/2005 $7,280.00 $33,410.00 $33,410.00 rb 3/8/2004 $22,230.00 $22,230.00 rb 3/8/2004 $1,263.36 $1,263.36 rb 7/28/2004 $1,760.40 $1,760.40 rb 7/28/2004 $14,624.46 $14,624.46 rb 3/30/2004 $160.00 $160.00 rb 4/28/2004 $320.00 $320.00 rb 5/5/2004 $1,400.00 $100.00 di 2/16/2005 $1,300.00 $545.48 $250.28 $250.28 di 2/16/2005 $780.00 $60.00 $60.00 di 2/16/2005 $1,300.00 $73,768.22 $73,768.22 $0.00 Total Fees Fees Paid Amount Owed $96,903.98 $77,118.50 $19,785.48 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control $800.00 911/2004 1111912002 Erosion Control 1249.45