Burch Lot 1-CS 950510 (2)The City With A Beautiful Future
P,O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Wes Burch
580 S. Denton Tap Road
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along-~iwi~ a :opy of
the Development Fee Calculations for the Burch Addition Lot 1 Blk. A.
Please make payment to the City of Coppell in the amount of $4.320.00 and forward
Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Fa
estimate or contract for this project will need to be provided to our department so the cot
inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of th~
fees and insure a successful beginning of this project. We look forward to working with
Alan
lgineer's
~truction
required
)u on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
CC:
Alan Johnson, Finance Director
Greg Jones, Building Official
~oug Stevens, Engineering Tec,hnician
~ov;~ l. affora, u~ltl~ S~rintm~t '
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
- CITY OF COPPELL
DEVELOPMENT FEES
Date: May 10, 1995
Project: Burch Addition Lot 1 Blk. A
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 3,375.00 3,375.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 300.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 945.00 945.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 46.05
(100% due at Issuance of Water Meter)
Water Meter Deposit 105.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) 2,424.25
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $7,245.30 $4,320.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL ENGINEERING
MEMORANDUM
DATE:
TO:
FROM:
RE:
May 4, 1995
Mike Martin, E.I.T.
Howard Pafford, Utilities Superintendent
Development Fees for Burch Addition Lot 1 Blk.A
The following fees
referenced project.
Water Impact Fee:
1 -1"
1 -8"
Total
should be assessed and collected on the above
100% due prior to Council approval
Domestic Meter/s = 2.5 ESU's
Irrigation Meter/s = 2.5 ESU's
Fireline Meter/s = 2.5 ESU's
7.5 ESU's @ $450.00 ea = $ 3,375.00
of the final plat.
Wastewater Impact
1 - 1"
Total 2.5
Domestic Meter/s = 2.5 ESU's
ESU's @ $450.00 ea = $ 945.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 1" Domestic Meters ~ 46.05 ea = $ 46.05
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee
1 - 1"
1 - 8"
(Irrigation/Fireline)
Irrigation Meter/s @
Fireline Meter/s @ $
$ 46.05 ea
$ 2,378.20
100% due prior to issuance of water meter/s.
= $ 46.05
= $2.378.20
Water Meter Deposit (Multi-Family or Non-Residential)
3 Meters @ $35.00 ea = $ 105.00
100% due prior to issuance of water meters.