The following fees
referenced project.
Water Impact Fee:
1 - 1"
1 -8"
Total
7.5
100% due prior to Council
should be assessed and collected on the above
Domestic Meter/s = __
Irrigation Meter/s = __
Fireline Meter/s = __
ESU's @ $450.00 ea = $ 3,375.00
approval of the final plat.
2.5 ESU's
2.5 ESU's
2.5 ESU's
Wastewater Impact
1 - 1"
Total 2.5
Domestic Meter/s = 2.5 ESU's
ESU's ~ $450.00 ea = $ 945.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 1- Domestic Meters @ 46.05 ea = $ 46.05
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1- Irrigation Meter/s @ $ 46.05 ea = $ 46.05
~ - 8" Fireline Meter/s @ $
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential~
3 Meters @ $35.00 sa = $ 105.00