Loading...
Burch Lot 1-CS 950504COPPELL ENGINEERING MEMORANDUM DATE: TO: FROM: RE: May 4, 1995 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Burch Addition Lot 1 Blk.A The following fees referenced project. Water Impact Fee: 1 - 1" 1 -8" Total 7.5 100% due prior to Council should be assessed and collected on the above Domestic Meter/s = __ Irrigation Meter/s = __ Fireline Meter/s = __ ESU's @ $450.00 ea = $ 3,375.00 approval of the final plat. 2.5 ESU's 2.5 ESU's 2.5 ESU's Wastewater Impact 1 - 1" Total 2.5 Domestic Meter/s = 2.5 ESU's ESU's ~ $450.00 ea = $ 945.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 1- Domestic Meters @ 46.05 ea = $ 46.05 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1- Irrigation Meter/s @ $ 46.05 ea = $ 46.05 ~ - 8" Fireline Meter/s @ $ 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential~ 3 Meters @ $35.00 sa = $ 105.00 100% due prior to issuance of water meters.